LAW.coLAW.co

Crocker Park, L.L.C. v. Westlake

2026-07-30

Authorities cited

Opinion

majority opinion

[Cite as Crocker Park, L.L.C. v. Westlake, 2026-Ohio-2932.]

COURT OF APPEALS OF OHIO

EIGHTH APPELLATE DISTRICT

COUNTY OF CUYAHOGA

CROCKER PARK, LLC, ET AL., :

Plaintiffs-Appellees, :

No. 115356

v. :

CITY OF WESTLAKE, OHIO, :

Defendant-Appellant. :

JOURNAL ENTRY AND OPINION

JUDGMENT: AFFIRMED IN PART, REVERSED IN PART,

AND REMANDED

RELEASED AND JOURNALIZED: July 30, 2026

Civil Appeal from the Cuyahoga County Court of Common Pleas

Case No. CV-24-106203

Appearances:

Benesch, Friedlander, Coplan & Aronoff, LLP, Gregory J.

Phillips, and Alayna K. Bridgett, for appellees.

Michael P. Maloney, Westlake Director of Law, and Robin

R. Leasure, Westlake Assistant Director of Law; Seeley,

Savidge, Ebert & Gourash Co., LPA and Christopher M.

Corrigan, for appellant.

EILEEN T. GALLAGHER, P.J.:

Defendant-appellant City of Westlake, Ohio (“Westlake” or “the City”)

appeals two orders granting partial motions for summary judgment against Westlake and in favor of plaintiffs-appellees Crocker Park, L.L.C. (“CP”), CP Phase

I Residential Delaware, L.L.C., Crocker Excelsior, L.L.C., CP Commercial Delaware,

L.L.C. (“CP Commercial”), and CP Land, L.L.C. (collectively “plaintiffs”) and thirdparty-defendant-appellee Crocker Park Management, L.L.C. (“CP Management”).

Westlake claims the following errors:

1. The Court of Common Pleas abused its discretion in ordering the

plaintiffs to file summary judgment when pleadings had not been

finalized and discovery had not been conducted on the issues[.]

2. The court erred [in] granting summary judgment when the parties

had not conducted discovery on the facts of the dispute and all

information was not before the court[.]

3. The court erred in granting plaintiffs’ summary judgment on

defendant’s counterclaim for slander of title[.]

4. The court erred [in] granting plaintiffs summary judgment on

defendant’s . . . abuse of process claim[.]

5. The court erred [in] declaring that plaintiffs have not waived their

ability/right to assert its right of first refusal on future offers[.]

We find that the trial court did not err in granting the parties leave to

file motions for summary judgment by March 17, 2025, because the pleadings had

closed by that time, and Westlake could have sought leave for additional discovery

pursuant to Civ.R. 56(F), if additional discovery were needed. We further find that

the trial court properly granted summary judgment in favor of plaintiffs and the

third-party defendant on Westlake’s slander-of-title and abuse-of-process claims.

However, because we find that CP failed to properly exercise its right of first refusal

within a reasonable time, we find that the trial court erred in declaring that CP did not waive its right of first refusal. We, therefore, affirm the trial court’s judgment in

part, reverse it in part, and remand the case to the trial court for further proceedings.

I. Facts and Procedural History

Plaintiffs filed a complaint and a verified amended complaint against

Westlake, alleging the breach of multiple contracts and seeking various forms of

declaratory and injunctive relief as well as money damages.1 The allegations arose

from the parties’ relationship to a mixed-use development located on Crocker Road

in Westlake, Ohio, known as “Crocker Park.”

Crocker Park was developed on multiple contiguous parcels of property

and contains a mix of retail stores, restaurants, office buildings, apartments, and

green spaces. The Crocker Park planners intended the different parcels of property

that compose Crocker Park “to interrelate and function to their mutual advantage

and benefit such that the eventual owners of the parcels, and their permittees, would

have access to certain ‘common areas’ throughout the development.” (Verified

amended complaint ¶ 12.) Thus, CP drafted a “Declaration of Covenants,

Conditions, Restrictions and Easements” (the “Declaration”) governing the use and

ownership of the various parcels that compose Crocker Park.2 The Declaration

1 The allegations in, and the exhibits attached to, the amended complaint were

verified under oath by Steve Coven, the secretary of CP and general counsel of Stark Enterprises, Inc., CP’s agent, exclusive property manager, and leasing agent.

2 The Declaration was verified and submitted with the verified amended complaint

as Exhibit A. Coven also verified the authenticity of the Declaration in an affidavit submitted with plaintiffs and third-party defendant’s motion for partial summary judgment.

identifies CP as the declarant and defines the term “Owner” or “Owners” to mean

“the current and future owners of the parcels comprising Crocker Park.” (Verified

amended complaint, Exhibit A.)

One of the disputes between plaintiffs and Westlake involved the cost

of maintaining and repairing “Common Areas.” Section 1.9 of the Declaration

defines the term “Common Area,” in part, as “all portion of the Project Site available

for the general use, convenience and benefit of all Owners and their respective

Permittees,” subject to some exceptions not relevant to this case.

Section 1.10 of the Declaration defines the term “Common Expenses”

as follows:

The term “Common Expenses” means (i) the cost and expense of

operating, maintaining, repairing and replacing the Common Area

and/or the Public Improvements, including, but not limited to, all costs

and expenses incurred by [CP Management] under the Management

Agreement; (ii) the cost of utilities serving the Common Areas and/or

the Public Improvements, (iii) the cost of garbage and trash removal

for the Project, except special charges that can be specifically identified

as belonging to one Parcel, (iv) the cost, expense, and premium for all

insurance attributed to Common Areas; (v) Real Estate Taxes for the

Common Areas and/or the Public Improvements (if any), and (vi) any

other cost, expense, fee or charge deemed a Common Expense under

this Declaration.

Regarding maintenance and repair of Common Areas, Section 6.2 of the

Declaration provides:

Subject to the payment provisions in Section 6.4 hereof and the

easements, terms, covenants, conditions, restrictions and rights

granted, declared and/or reserved hereunder, the Common Areas shall

at all times be maintained and managed by Declarant except that each

Owner is required to provide security for the Common Areas located

within its respective Parcel and Declarant shall have the obligation and

responsibility to keep, maintain, manage and operate the Common

Areas in good, clean operating condition, order and repair consistent

with the operation of similar first-class mixed-use developments

located in the State of Ohio and shall keep the Common Areas clean

and (as applicable) reasonably clear of snow and ice. Notwithstanding

the foregoing, Declarant agrees that the Public Improvements, if

constructed, may be maintained and managed by [CP Management] in

accordance with standards established under applicable Port Authority

Agreements. Declarant shall (and [CP Management], as to the Public

Improvements, may) manage, calculate and coordinate among the

Owners the payment of Common Expenses.

Section 6.4 of the Declaration governs payment of Common Expenses

and states, in relevant part: “Each Owner shall pay to Declarant (or [CP

Management] as to the Public Improvements), pursuant to the provisions of this

Section 6.4, its share of the Common Expenses, calculated based on the Budget and

such Owner’s Proportionate Share.” Section 1.50 defines the term “Proportionate

Share” as “the percentage assigned by Declarant from time to time with respect to

each Parcel/Owner.” (Declaration p. 8.) Section 6.4(b) requires that “[e]ach

Owner’s share of the Common Expenses shall be paid in equal monthly installments

in such amounts as are reasonably estimated and billed by Declarant.” The

Declaration was recorded with the Cuyahoga County Recorder on December 8,

2003. (Verified amended complaint ¶ 29.)

In March 2014, CP and Westlake executed the “Market Square

Development Agreement” (the “Development Agreement”) whereby CP agreed to

“convey to the City, at no cost to the City, approximately two (2) acres of land within [Crocker Park].”3 (Verified amended complaint ¶ 32; development agreement p. 1.)

In exchange for the free land, Westlake “agreed to construct on the Parcels, at the

City’s cost, a market square with improvements to be designed and adjacent open

space.” (Verified amended complaint ¶ 33; development agreement p. 1.) The land

conveyed to Westlake, together with its improvements, is known as “Market

Square.” (Verified amended complaint ¶ 35.) Westlake accepted deeds to the land

subject to “any reservations, restrictions, limitations, easements, and conditions of

title[,]” including the conditions of title outlined in the Declaration. (Verified

amended complaint ¶ 37-38.) Hence, Westlake became an owner of Crocker Park

subject to the covenants, conditions, and restrictions set forth in the Declaration.

Market Square was constructed and became operational in 2015.

(Verified amended complaint ¶ 47.) It is comprised of an indoor event space, a halfacre outdoor green space, and two restrooms with entrances on the exterior of the

building. The restrooms have been open to all “Permittees” since they were

constructed.4 (Verified amended complaint ¶ 49.) Plaintiffs allege that “Market

Square’s greenspace and restrooms constitute Common Areas as defined in the

Declaration.” (Verified amended complaint ¶ 50.) They also allege that “Market

Square’s common restrooms must remain open and accessible to other Owners and

3 The Development Agreement is attached to the verified amended complaint as

Exhibit B.

4 Section 1.42 of the Declaration defines the term “Permittees” to include “all

occupants, including tenants, of the Parcels and their and each Owner’s respective officers, directors, employees, agents, partners, contractors, customers, visitors, invitees, licensees and concessionaries.”

their Permittees in order for Crocker Park to comply with local zoning and building

codes.” (Verified amended complaint ¶ 51.)

In September 2015, Westlake entered into an Operation and

Maintenance Agreement (“O&M Agreement”) with CP Management, a wholly

owned subsidiary of CP.5 Under the O&M Agreement, CP Management agreed to

operate and manage Market Square. Section 3(b) of the O&M Agreement provides,

among other things, that CP Management will perform “all maintenance and repairs

to [Market Square].” The O&M Agreement further states that “[i]n the event that

revenues in any year are insufficient to pay in full all out-of-pocket expenses from

the operation of [Market Square], [CP Management] will be obligated to pay the

unpaid portion of such out-of-pocket expenses.” (Verified amended complaint ¶ 57;

O&M Agreement, Section 3(c).)

CP Management operated Market Square for eight years until

Westlake terminated the agreement in December 2023. Plaintiffs allege there were

insufficient revenues to pay for out-of-pocket expenses related to the operation of

Market Square, including its proportionate share of the Common Expenses, during

the eight years that CP Management managed Market Square. (Verified amended

complaint ¶ 60-61.) As a result, CP Management paid the out-of-pocket expenses,

including Common Expenses, for the eight years it managed Market Square.

5 The O&M Agreement is attached to the original complaint as Exhibit D.

Plaintiffs allege that after the O&M Agreement terminated on

December 31, 2023, CP Management was no longer responsible for paying

Westlake’s proportionate share of Common Expenses as required under the

Declaration. (Verified amended complaint ¶ 63-64.) In March 2024, CP sent a letter

to Westlake advising it of its obligation to pay Common Expenses as required by the

Declaration. (Plaintiffs and third-party defendant’s partial motion for summary

judgment filed on March 17, 2025, Exhibit B-9.) Along with the letter, CP enclosed

a proposed 2024 budget for the Common Expenses. On April 5, 2024, the City

replied with a letter stating, in relevant part:

The City of Westlake disputes your client’s claim that the City owes a

common area maintenance fee as a result of terminating the Market

Square Management Agreement. . . . [T]he City disagrees that it is

obligated to pay these maintenance fees, and therefore declines to pay

the same.

(Verified amended complaint ¶ 70; plaintiffs and third-party defendant’s motion for

summary judgment filed on March 17, 2025, Exhibit B-10.)

Thereafter, on April 30, 2024, Steven Coven (“Coven”) sent a letter to

Westlake advising it that it was in default of the Declaration for failing to pay its

proportionate share of the Common Expenses for Market Square from January

through March 2024.6 (Verified amended complaint ¶ 74; R. 52, Exhibit B-12.) CP

Commercial claimed the City owed $22,367.37 in Common Expenses for the first

three months of 2024. In a letter from Westlake’s mayor dated May 7, 2024, the

6 As previously stated, Coven is general counsel of Stark Enterprises, Inc., CP’s

agent and exclusive property manager and leasing agent.

City again repudiated the claimed expenses. (Plaintiffs and third-party defendant’s

motion for summary judgment filed on March 17, 2025, Exhibit B-13.) As a result,

plaintiffs placed a lien on Market Square, for the outstanding Common Expenses in

the amount of $22,367.37.

On October 8, 2024, CP sent the City another default notice regarding

its outstanding proportionate share of Common Expenses for Market Square from

April through September 2024, totaling $36,974.41. (Verified amended complaint

¶ 75; plaintiffs and third-party defendant’s motion for summary judgment filed on

March 17, 2025, Exhibit B-15.) In November 2024, Westlake sent CP letters and

checks totaling $70,525.45, for “the common expenses allegedly owed by the City of

Westlake.” (Verified amended complaint ¶ 76; plaintiffs and third-party defendant’s

motion for summary judgment filed on March 17, 2025, Exhibit B-16-17.) Plaintiffs

allege that Westlake paid the outstanding Common Expenses in order to release the

lien because it wanted to sell the property. (Verified amended complaint ¶ 78.)

On October 1, 2024, the mayor of Westlake sent CP a letter notifying

it that the City had received an offer from E&C Sports Group, L.L.C. (the “buyer” or

“E&C”) to purchase Market Square. (Verified amended complaint ¶ 80, Exhibit L.)

The letter acknowledged that under the parties’ Development Agreement, CP

retained a right of first refusal. The letter further stated, in relevant part:

Please notify me, in writing, by October 15, 2024, if Crocker Park, L.L.C.

is exercising its right to acquire the Markert Square Property . . . .

Failure to exercise the right of first refusal at this time will be deemed

a waiver of said right in the future.

(Verified amended complaint, Exhibit L.) Plaintiffs allege that the City’s letter

unilaterally imposed a temporal restriction on CP’s right of first refusal because the

Development Agreement did not contain such a restriction. (Verified amended

complaint ¶ 84.) They also allege that the letter “incorrectly stated that CP’s right of

first refusal requires it to obtain Market Square under ‘the same terms and

conditions’ as those set out in the proposed agreement between the City and its

third-party buyer.” (Verified amended complaint ¶ 85.) Plaintiffs allege that Section

9 of the Development Agreement only requires that CP agree to “the same price

offered by such third party” and that no other conditions related to the third party

are binding on CP. (Verified amended complaint ¶ 85.)

Plaintiffs allege that the City did not inform the buyer of its obligations

under the Declaration to pay its proportionate share of the Common Expenses as

the owner of Market Square before E&C made its original offer. They allege that the

City only informed the buyer of this approximately $70,000 per year obligation after

the City informed CP of the proposed sale. Nevertheless, CP communicated to the

City that it intended to exercise its right of first refusal to purchase Market Square.

The City acknowledged receipt of the communication in a letter dated November 5,

2024. The November 5, 2024 letter instructed CP to “deliver a formal and detailed

written offer to [the Mayor] and the City of Westlake within seven (7) days of this

letter.” (Verified amended complaint ¶ 105, Exhibit O.) Plaintiffs allege this sevenday deadline was manufactured by Westlake and was not required under the terms

of the Development Agreement. (Verified amended complaint ¶ 105.)

Plaintiffs responded in a letter dated November 7, 2024, stating that

[w]hile CP disagrees with the City’s characterization of the parameters

of CP’s right of first refusal, and further denies that any third-party

offer to date has activated CP’s right of first refusal, CP intends to make

an offer on the Market Square property. CP would like to discuss this

offer with the City at the City’s earliest convenience.

(Verified amended complaint ¶ 108, Exhibit P.)

CP asked to discuss the purchase of Market Square with the City’s

mayor and council president. Plaintiffs allege the City’s counsel refused to allow

direct talks with the mayor and council president and represented to them that any

requested meeting would be with the City’s counsel over the phone. (Verified

amended complaint ¶ 110-112.) CP also asked that Westlake remove the deadline

for exercising its right of first refusal and now claims the City refused.

On November 21, 2024, CP sent a letter to Westlake offering to

purchase the Market Square property for $2,600,000, the same price offered by

E&C, subject to certain conditions, including that (1) the property would be exempt

from property tax, and (2) “the Purchase Price will be eligible for reimbursement

from the Crocker Park Phase 3 waterfall.” (Verified amended complaint, Exhibit Q.)

According to the amended counterclaim, CP knew the conditions set forth in the

November 21, 2024 letter are not contemplated by Section 9 of the Development

Agreement and that they are not legally permissible since R.C. 5709.40 does not

allow tax increment financing and payments in lieu of taxes. (Verified amended

complaint ¶ 114, Exhibit Q.)

The City rejected the offer in a letter dated November 21, 2024, stating

that CP’s offer was untimely and it did not match the material terms of the buyer’s

offer. (Verified amended complaint ¶ 115, Exhibit R.) CP responded in a letter that

same day, stating that “[t]he City’s rejection of [CP]’s exercise of its ROFR is legally

erroneous and ignores the plain language of the Development Agreement.”

(Verified amended complaint ¶ 117, Exhibit S.)

On November 7, 2024, the City began the process of submitting its

agreement with E&C to the city council for approval. (Verified amended complaint

¶ 111.) Plaintiffs assert that the City’s failure to accept CP’s exercise of its right of

first refusal to purchase Market Square constitutes a breach of contract.

In their prayer for relief, plaintiffs requested declaratory judgments

declaring that (1) the Market Square property is subject to the terms and conditions

of the Declaration, (2) the City is an “Owner” obligated to pay Common Expenses

under Section 6.4(a) of the Declaration, (3) Market Square contains Common Areas

as defined by the Declaration, including the common restrooms and green space, (4)

the Development Agreement does not set a temporal restriction on CP’s ability to

exercise its right of first refusal, and (5) under the Development Agreement, CP is

only obligated to match the purchase price proposed by a third-party buyer to

exercise its right of first refusal and nothing else.

Plaintiffs further requested a preliminary and permanent injunction

enjoining the City from selling Market Square until the issues raised in their verified amended complaint are resolved.7 Plaintiffs also sought monetary damages in

excess of $25,000.

Westlake answered plaintiffs’ verified amended complaint and

asserted counterclaims for abuse of process, slander of title, quiet title, and for

declaratory relief. The City alleged in the third-party complaint that, under the

direction of CP, CP Management did not pay revenues to the City and refused to

provide financial records for the operations of Market Square to the City. (Amended

counterclaim ¶ 7-8.) It also alleged that the mayor informed CP that it intended to

sell Market Square in December 2023. (Amended counterclaim ¶ 9.)

It is undisputed that in June 2024, CP Commercial filed a lien on the

Market Square property to cover Common Expenses, in the amount of $ 22,367.37.

Westlake alleged that the City paid all outstanding Common Expenses in November

2024, that CP Commercial deposited the funds from Westlake without objection,

but it nevertheless refused to withdraw the lien on the property. (Amended

counterclaim ¶ 13-17.) The City contends that representatives of CP Commercial

7 On January 24, 2025, while the lawsuit was pending, CP and E&C executed the

“Market Square Right of First Refusal Agreement and Mutual Release” (the “E&C Market Square Agreement”) wherein CP agreed to forbear exercising its right of first refusal as set out in the Development Agreement and allow the City to proceed with the sale of Market Square to E&C. (Verified amended complaint ¶ 37.) On that same day, plaintiffs withdrew their claims for injunctive relief. In executing the E&C Market Square Agreement, E&C expressly acknowledged and agreed that the Market Square property is subject to the terms and conditions of the Declaration, including the obligation requiring each owner to pay its proportionate share of the common expenses incurred for the maintenance of common areas.

made the removal of the lien part of the negotiations to force Westlake to accept CP’s

terms and conditions even though the lien was paid. (Amended counterclaim ¶ 18.)

The City acknowledged in the amended counterclaim that the mayor

sent a letter to CP on October 1, 2024, requesting that CP inform Westlake “in

writing” by October 15, 2024, if it was going to exercise its right of first refusal.

(Amended counterclaim ¶ 25.) The mayor subsequently extended the deadline to

October 31, 2024. (Amended counterclaim ¶ 25-26.)

Regarding any temporal restrictions on CP’s right of first refusal,

Westlake quoted language from Section 11(f) of the Development Agreement, which

states that “[t]ime is of the essence with respect to all time periods and dates for the

performance of the City’s and [CP]’s respective obligations under this Agreement.”

(Amended counterclaim ¶ 23.) The City alleges that it was waiting for a response as

to whether CP was going to exercise its right of first refusal when plaintiffs filed their

initial complaint on October 28, 2024.

When CP did not submit an offer to purchase the Market Square

property by the October 31, 2024 deadline, Westlake, through counsel, sent a letter

to Coven, dated November 5, 2024, asking that CP either make a written offer by

end of business November 12, 2024, or inform it that it was not going to exercise its

right of first refusal. (Amended counterclaim ¶ 31, Amended verified complaint,

Exhibit O.) The November 5, 2024 letter advised CP that if Westlake did not receive

a matching offer from CP by the end of business November 12, 2024, the City would

proceed with the sale to E&C. (Amended counterclaim ¶ 32.) The November 5, 2024 letter states, in part, that “[t]ime is of the essence in this matter because E&C Sports,

L.L.C., has made an acceptable offer and would like to proceed with the purchase,

as would the City of Westlake.” (Verified amended complaint, Exhibit O.)

Westlake alleges that because CP did not submit an offer to purchase

the Market Square property by the deadline, and it did not request additional time

beyond the deadline, the City placed the purchase agreement with the buyer on the

city council’s agenda to begin the approval process. (Amended counterclaim ¶ 40-41.)

On January 30, 2025, Westlake filed a third-party complaint against

CP Management, alleging that CP Management breached its obligation under the

M&O Agreement by failing to timely provide monthly operating statements and

year-end financial statements to Westlake. (Third-party complaint ¶ 12-14.)

Based on the allegations set forth in the amended counterclaim,

Westlake asserted an abuse-of-process claim against CP, alleging that CP

improperly initiated this lawsuit in order to interfere with Westlake’s pending

contract with E&C while CP was not willing to match C&E’s offer. In the second

count, Westlake sought a declaratory judgment declaring that CP’s offer was not a

legitimate offer under the Development Agreement because the Agreement does not

contemplate CP’s request to make the property exempt from property taxes. It also

sought a declaration that CP’s request for a tax exemption violates R.C. 5709.40.

In the third count, Westlake asserted a claim for slander of title

against CP Commercial, alleging that CP Commercial illegally maintained a lien on the property after the debt, which was the subject of the lien, had been paid.

Westlake also asserted an abuse-of-process claim against CP Commercial, alleging

that it illegally maintained the lien on the property in order to compel Westlake to

sell the property to CP on CP’s terms. And, Westlake asserted a claim for quiet title

to remove the lien on the property pursuant to R.C. 5303.01.

On January 29, 2025, the trial court granted the parties leave to file

cross-motions for summary judgment by March 17, 2025. The parties each filed

motions for summary judgment, and plaintiffs, over objection, filed a supplemental

motion for summary judgment. On June 22, 2025, the trial court granted plaintiffs’

motions for partial summary judgment and denied Westlake’s motion for partial

summary judgment. The trial court found that the Declaration applied to Westlake

and that it was required to pay its proportionate share of Common Expenses. It also

found that green space and the exterior restrooms on the Market Square property

are Common Areas as defined in the Declaration.

On July 13, 2025, the trial court granted plaintiffs’ supplemental

motion for summary judgment as to Westlake’s claim for declaratory judgment. The

trial court declared that CP did not waive its right of first refusal on any offers to

purchase the Market Square property. In its order, the court declared there was no

just cause for delay. This appeal followed.

II. Law and Analysis

A. Pleadings and Discovery

In the first assignment of error, Westlake argues the trial court erred

in granting summary judgment in favor of plaintiffs before the close of the pleadings

and without allowing the parties to conduct discovery. In the second assignment of

error, Westlake argues the trial court erred in granting summary judgment in favor

of plaintiffs before the parties had an opportunity to conduct discovery. We discuss

these assigned errors together because they are interrelated.

On January 29, 2025, the trial court issued a journal entry granting

the parties leave until March 17, 2025, to file motions for summary judgment. One

day later, on January 30, 2025, Westlake filed its amended answer and

counterclaims as well as its third-party complaint against CP Management. Thus,

the court granted the parties leave to file motions for summary judgment prior to

the close of the pleadings. However, the record shows that the parties actually filed

their motions for summary judgment after the pleadings closed.

Civ.R. 56 governs summary judgment and states, in relevant part, that

“[a] party may move for summary judgment at any time after the expiration of the

time permitted under these rules for a responsive motion or pleading by the adverse

party, or after service of a motion for summary judgment by the adverse party.”

Civ.R. 56(A). Nothing in the rule prevents the trial court from granting parties leave

to file summary-judgment motions before the close of pleadings as long as the motions are filed after “the expiration of the time permitted under these rules for a

responsive motion or pleading by the adverse party[.]” Civ.R. 56(A).

As previously stated, Westlake filed its amended answer, amended

counterclaims, and third-party complaint on January 30, 2025. Plaintiffs filed their

response to Westlake’s amended counterclaims on February 13, 2025, and CP

Management filed its answer to the third-party complaint on February 27, 2025. At

that point, the pleadings were closed. The parties filed their respective motions for

summary judgment on March 17, 2025, more than two weeks after the pleadings

closed. Therefore, the motions for summary judgment were filed in accordance with

the requirements of Civ.R. 56(A). Westlake has not cited any legal authority to

support its assertion that the trial court erred in granting the parties leave to file

summary-judgment motions prior to the close of pleadings when the motions were

filed after the pleadings were closed, nor have we found any. We, therefore, find no

error in the trial court’s January 29, 2025 judgment entry, granting the parties leave

to file motions for summary judgment by March 17, 2025.

Westlake nevertheless contends that the trial court erred in ordering

motions for summary judgment to be filed before the parties completed discovery.

However, “the remedy for a party who must respond to a summary judgment motion

before he or she has completed adequate discovery is a motion under Civ.R. 56(F).”

Reigles v. Urban, 2010-Ohio-4427, ¶ 12 (11th Dist.). And, “‘a party who fails to seek

relief under Civ.R. 56(F) in the trial court does not preserve its rights thereto for

purposes of appeal.’” Maschari v. Tone, 2004-Ohio-5342, ¶ 20, quoting Taylor v. Franklin Blvd. Nursing Home, Inc., 112 Ohio App.3d 27, 30 (8th Dist. 1996).

Therefore, because Westlake failed to seek additional discovery as provided in

Civ.R. 56(F), it forfeited this argument for purposes of appeal.

Accordingly, the first and second assignments of error are overruled.

B. Summary Judgment

In the third and fourth assignments of error, Westlake argues the trial

court erred in granting summary judgment in favor of plaintiffs on its counterclaims

for slander of title and for abuse of process. In the fifth assignment of error,

Westlake argues the trial court erred in granting summary judgment in favor of CP

on its declaratory-judgment claim seeking a decree that Westlake has the right to

transfer title of the property to E&C because CP waived its right of first refusal.

1. Standard of Review

Appellate review of summary judgments is de novo. Grafton v. Ohio

Edison Co., 77 Ohio St.3d 102, 105 (1996). Pursuant to Civ.R. 56(C), summary

judgment is appropriate when (1) there is no genuine issue of material fact; (2) the

moving party is entitled to judgment as a matter of law; and (3) reasonable minds

can come to but one conclusion and that conclusion is adverse to the nonmoving

party, the party being entitled to have the evidence construed most strongly in his

or her favor. Horton v. Harwick Chem. Corp., 73 Ohio St.3d 679 (1995), paragraph

three of the syllabus.

The party moving for summary judgment bears the burden of showing

that there is no genuine issue of material fact and that he or she is entitled to judgment as a matter of law. Dresher v. Burt, 75 Ohio St.3d 280, 292-293 (1996).

Once the moving party satisfies its burden, the nonmoving party “may not rest upon

the mere allegations or denials of the party’s pleadings, but the party’s response, by

affidavit or as otherwise provided in this rule, must set forth specific facts showing

that there is a genuine issue for trial.” Civ.R. 56(E); Mootispaw v. Eckstein, 76 Ohio

St.3d 383, 385 (1996).

2. Slander of Title

In the third assignment of error, Westlake argues the trial court erred

in granting summary judgment in favor of CP Commercial on Westlake’s slanderof-title claim.

To prevail on a slander-of-title claim, a plaintiff must prove “‘(1) there

was a publication of a slanderous statement disparaging claimant’s title; (2) the

statement was false; (3) the statement was made with malice or made with reckless

disregard of its falsity; and (4) the statement caused actual or special damages.’” N.

Royalton Ct. Condo. Owners’ Assn. v. Stadul, 2024-Ohio-1280, ¶ 27 (8th Dist.),

quoting Green v. Lemarr, 139 Ohio App.3d 414, 430 (2d Dist. 2000).

In support of plaintiffs and third-party defendant’s motion for

summary judgment, they submitted an affidavit from Coven in which he averred

that although CP repeatedly reminded Westlake of its obligation under the

Declaration to pay its proportionate share of Common Expenses, the City refused to

pay its proportionate share of the Common Expenses. (Coven affidavit ¶ 11.)

Section 19.11(a) of the Declaration governs liens and enforcement

thereof and states, in part, that “[e]ach Owner’s obligation to pay its Proportionate

Share of the Common Expenses or any charge or payment provided in this

Declaration shall, to the extent permitted by law, constitute a lien on each Owner’s

respective Parcel.” Section 19.11(b) further states:

If an Owner of a Parcel shall fail to pay its Proportionate Share of the

Common Expenses or any other sum which becomes due under this

Declaration within thirty (30) days following receipt of the bill

therefore . . . the other Owners shall, to the extent now or hereafter

permitted by law, have the right and power to enforce the lien imposed

by Section 19.10(a).

According to Coven, Westlake “repudiated its obligations under the

Declaration” and expressly disputed plaintiffs’ claim that Westlake was obligated to

pay its proportionate share of Common Expenses incurred for maintenance of

Common Areas. (Coven affidavit ¶ 12.) Coven further averred that on April 30,

2024, CP notified Westlake that it was in default of the Declaration for failing to pay

its share of Common Expenses from January through March 2024, totaling

$22,367.37. Thereafter, CP Commercial filed the lien on June 12, 2024, in an effort

to collect the outstanding principal balance and interest as contemplated by Section

6.4(b) of the Declaration, which provides that each owner’s share of Common

Expenses “shall be paid in equal monthly installments in such amounts as are

reasonably estimated and billed . . . at the beginning of each calendar year according

to the Budget[.]” Section 6.4(b) further states, in relevant part:

If any installment of Common Expenses remains unpaid after the tenth

(10th) day of any calendar month, such Owner shall be deemed to be a

Defaulting Owner and shall incur interest at the per annum rate equal

to two percent (2%) in excess of the announced “prime” or “base” rate

of interest reported in the Money Returns column or comparable

section of The Wall Street Journal as the rate then in effect for

corporate loans at large U.S. money center commercial banks, whether

or not such rate has actually been charged by any such bank (the

“Default Interest Rate”) from the date said installment was actually due

until the date actually paid.

It is undisputed that, in November 2024, Westlake paid the

$22,367.37 that it owed for the first three months of Common Expenses. CP

Commercial argues that Westlake continued to owe unpaid interest that accrued on

the outstanding debt and that it, therefore, had a legitimate basis for maintaining

the lien on the Market Square property after Westlake paid the $22,367.37. (Coven

affidavit ¶ 19.) Therefore, CP Commercial argues, Westlake cannot demonstrate

that the lien was false or slanderous.

Westlake, however, argues that when CP Commercial cashed

Westlake’s check for $22,367.37, its acceptance of that payment constituted an

accord and satisfaction of the City’s entire debt. An accord is a contract between a

debtor and a creditor in which the creditor’s claim is settled in exchange for sum of

money other than the amount that is allegedly due. Allen v. R.G. Indus. Supply, 66

Ohio St.3d 229, 231 (1993). “‘If a party against whom a claim for damages is made

can prove accord and satisfaction, that party’s debt is discharged by operation of

law.’” Byars v. RLG Builder, Inc., 2010-Ohio-2869, ¶ 31 (5th Dist.), quoting Allen at

231.

When an accord and satisfaction is pled by the defendant as an

affirmative defense, the court’s analysis must be divided into three

distinct inquiries. First, the defendant must show that the parties went

through a process of offer and acceptance — an accord. Second, the

accord must have been carried out — a satisfaction. Third, if there was

an accord and satisfaction, it must have been supported by

consideration.

Two essential safeguards built into the doctrine of accord and

satisfaction protect creditors or injured parties from overreaching

debtors or tortfeasors: (1) there must be a good-faith dispute about the

debt, and (2) the creditor must have reasonable notice that the check is

intended to be in full satisfaction of the debt.

Allen at 231, paragraphs one and two of the syllabus. See also M&T Elec. Co. v.

LLLJ, Ltd., 2024-Ohio-5678, ¶ 19 (8th Dist.) (“[T]he claim is discharged if the

defendant proves that the instrument or accompanying written communication

contained a conspicuous statement to the effect that the instrument was tendered as

full satisfaction of the claim.”).

On November 15, 2024, Westlake sent a letter with a check payable to

CP Commercial in the amount of $22,367.37, the amount of unpaid Common

Expenses. The letter that accompanied the check stated, in relevant part:

Enclosed is a $22,367.37 check payable to CP Commercial Delaware,

LLC as payment in full of the common area expenses owed by the

City of Westlake through April 2024.

This payment is satisfaction of your lien filed on June 12, 2024,

against the Market Square Property[.]

(Emphasis added.)

The parties dispute whether Westlake owed interest on the

outstanding debt for Common Expenses. CP Commercial asserts that Westlake’s

November 15, 2024 letter did not constitute full satisfaction of Westlake’s debt

because it did not include the accrued interest. Westlake argues that its letter clearly states that the enclosed payment constituted “payment in full of the common area

expenses” and that the payment “is satisfaction of your lien.” Taken together, these

statements provide notice that the enclosed payment was intended to satisfy the full

amount of Westlake’s debt.

However, there is no evidence that any consideration was provided in

exchange for the alleged discharge of Westlake’s debt. A preexisting duty to perform

an obligation cannot serve as consideration for a contract. Przylepa v. Przylepa, 77

Ohio App.3d 808, 811 (3d Dist. 1991), citing Shannon v. Universal Mtge. & Discount

Co., 116 Ohio St. 609, 621 (1927).

“An accord and satisfaction is the result of an agreement between the

parties, and this agreement, like all others, must be consummated by a

meeting of the minds of the parties. Mere cashing of the check d[oes]

not bring the transaction within the rule of accord and satisfaction.”

Lightbody v. Rust, 2003-Ohio-3937, ¶ 22 (8th Dist.), quoting Warner Elevator Mfg.

Co. v. Higbee, 53 Ohio App. 546, 548 (1st Dist. 1935).

At the very least, the parties disagree as to whether the debt was

discharged, and there was no meeting of the minds. Therefore, the City cannot

establish that CP Commercial maliciously or recklessly refused to remove the lien in

order to interfere with sale of the property to the buyer. In the absence of any

evidence of malice or recklessness on part of CP Commercial, the City cannot

establish the third element of its slander-of-title claim.

The third assignment of error is overruled.

3. Abuse of Process

In the fourth assignment of error, Westlake argues the trial court erred

in granting summary judgment in favor of plaintiffs on its two counterclaims for

abuse of process. In the first claim, Westlake alleged that CP improperly initiated

this lawsuit in order to interfere with Westlake’s pending contract with E&C. In the

second claim, Westlake alleged that CP Commercial refused to remove the lien on

the Market Square property in order to compel Westlake to sell the property to CP

on CP’s terms.

To prevail on an abuse-of-process claim, the claimant must establish

that (1) a legal proceeding has been set in motion in proper form and with probable

cause, (2) the proceeding has been perverted to accomplish an ulterior purpose for

which it was not designed, and (3) damage resulted from the wrongful use of the

process. Yaklevich v. Kemp, Schaeffer & Rowe Co., L.P.A., 68 Ohio St.3d 294

(1994), paragraph one of the syllabus.

“[T]he ‘ulterior motive’ component of an abuse-of-process claim

‘occurs where someone attempts to achieve through use of the court that which the

court is itself powerless to order.’” Murphy v. Ditech Fin., L.L.C., 2018-Ohio-5041,

¶ 6 (8th Dist.), quoting Robb v. Chagrin Lagoons Yacht Club, Inc., 75 Ohio St.3d

264, 271 (1996). “‘[T]here is no liability [for abuse of process] where the defendant

has done nothing more than carry out the process to its authorized conclusion, even

though with bad intentions.’” Yaklevich at 298, quoting Prosser and Keeton on the

Law of Torts, § 121, 898 (5th Ed. 1984).

Regarding Westlake’s first abuse-of-process claim, the City alleged

that CP “filed suit, issued subpoenas, filed the motion for an injunction and took

other delay tactics and made personal attacks on the purchasers in the pleadings for

the primary purpose of dissuading [the buyer] and other potential purchasers from

pursuing the purchasing of the Market Square Property.” (Amended counterclaim

¶ 56.) It further alleged that CP filed suit “for the purpose of eliminating the pool of

potential purchasers of the Market Square Property and drive down the purchase

price of the Market Square Property.” (Amended counterclaim ¶ 57.)

According to the verified amended complaint, plaintiffs initiated this

lawsuit to protect CP’s right of first refusal and to collect the City’s proportionate

share of unpaid Common Expenses. In its merit brief on appeal, Westlake asserts

that instead of responding to Westlake’s offer of additional time to match the buyer’s

offer, it “filed suit against Westlake and issued subpoenas to the potential purchaser

to harass it.” (Appellant’s brief p. 14.) However, Westlake does not cite any evidence

in the record to establish that CP’s actions drove away potential purchasers or drove

down the purchase price. Under App.R. 16(A)(7), an appellant must include not

only arguments presented for review, but the appellant must also support the

arguments in its brief with “‘citations to the authorities, statutes, and parts of the

record on which appellant relies.’” Victor v. Kaplan, 2020-Ohio-3116, ¶ 101 (8th

Dist.), quoting App.R. 16(A)(7).

CP presented evidence demonstrating that CP subsequently agreed to

forbear its right of first refusal and allow the City to execute its proposed sale of the Market Square property to the buyer, E&C Sports Group, L.L.C. (Coven affidavit

¶ 38.) And, E&C subsequently purchased the Market Square property for the

originally agreed upon price of $2.6 million (Phillips affidavit ¶ 2-3, plaintiffs and

third-party defendant’s motion for partial summary judgment, Exhibit E.).

Therefore, the City failed to establish that it sustained damage as a result of CP’s

actions. It also failed to produce any evidence that plaintiffs filed the lawsuit for an

ulterior purpose. Therefore, the trial court properly granted summary judgment in

favor of plaintiffs on Westlake’s first abuse-of-process claim.

Regarding Westlake’s second abuse-of-process claim, Westlake cites

no legal authority to support its claim that filing a lien constitutes a “legal

proceeding” that could be subject to an abuse-of-process claim. In any case, we have

already determined that CP Commercial had a legitimate basis for maintaining its

lien on the Market Square Property because the uncontroverted evidence

established that Westlake owed outstanding interest on its debt for Common

Expenses. The City has not produced any evidence that CP Commercial used the

lien for any other purpose. Therefore, the trial court properly concluded that CP was

entitled to summary judgment on the City’s abuse-of-process claim.

Accordingly, the fourth assignment of error is overruled.

4. Declaration Regarding CP’s Right Of First Refusal

In its fifth assignment of error, Westlake argues the trial court erred

in finding that CP did not waive its right of first refusal because plaintiffs did not

request such a declaration in the verified amended complaint.

However, in its amended counterclaim, Westlake alleged that it “is

entitled to an expedient declaration that Crocker Park has waived its rights under

Section 9 and 11(f) of the Market Square Development Agreement.” (Amended

counterclaims ¶ 71.) In its prayer for relief, Westlake requested, among other things,

a “decree that . . . Crocker Park, LLC, has waived its right to acquire Market Square.”

CP moved for summary judgment on Westlake’s claim for declaratory judgment as

part of its defense against the claim.

Civ.R. 56(B) provides that a party against whom a declaratory

judgment is sought may “move . . . for a summary judgment in the party’s favor as

to all or any part of the . . . declaratory judgment.” Similarly, R.C. 2721.02(A), which

governs the force and effect of declaratory judgments, states that “courts of record

may declare rights, status, and other legal relations whether or not further relief is

or could be claimed” and that “[t]he declaration may be either affirmative or

negative in form and effect.” Therefore, when a party moves for summary judgment

on claim for declaratory judgment, the court ruling on the motion for summary

judgment must declare the rights of the parties. Shell Oil Co. v. Huttenbauer Land

Co., 1993 Ohio App. LEXIS 1785, fn. 2 (1st Dist. Mar. 31, 1993.). Therefore, in ruling

on plaintiffs’ motion for summary judgment, the trial court was legally authorized

to declare judgment in favor of CP even though it did not specifically request the

declaration.

Westlake nevertheless argues the trial court erred in finding that CP

did not waive its right of first refusal to purchase the Market Square property. The City argues that CP waived its right of first refusal by failing to accept the offer to

purchase the property by its deadlines and because when it eventually made an offer,

the offer was subject to certain conditions.

On October 1, 2024, Westlake sent a letter to CP notifying it that the

City received an offer from the buyer. The letter instructed CP to notify the City if it

intended to exercise its right of first refusal under the same terms and conditions as

the buyer by October 15, 2024. Thus, the City set a two-week deadline by which CP

had to exercise its right of first refusal.

Section 9 of the Development Agreement provides CP’s right of first

refusal, and it does not impose a two-week deadline. Therefore, Westlake

unilaterally imposed the two-week deadline. However, Section 11(f) provides that

“[t]ime is of the essence with respect to all time periods and dates for the

performance of the City’s and the Company’s respective obligations under this

Agreement.”

“When it is said that time is of the essence, the proper meaning of the

phrase is that the performance by one party at the time specified in the

contract or within the period specified in the contract is essential in

order to enable him to require performance from the other party.”

(Emphasis changed.) Lake Ridge Academy v. Carney, 66 Ohio St.3d 376, 378

(1993), quoting 6 R. Lord, Williston on Contracts, § 846, at 181 (3d Ed. 1962).

“[W]hen a contract does not state the time for performance, then the

law implies a reasonable time for performance, and a factfinder must

determine whether the time spent performing is reasonable under the

circumstances.”

Sai Hosp., Inc. v. RCVV, Inc., 2025-Ohio-4596, ¶ 35 (7th Dist.), quoting Treadway

Gallery, Inc. v. Baylor, 2023-Ohio-3642, ¶ 11 (1st Dist.); see also Garofoli v.

Whiskey Island Partners Ltd., 2014-Ohio-5433, ¶ 35 (8th Dist.), quoting Lewis v.

DR Sawmill Sales, Inc., 2006-Ohio-1297, ¶ 18 (10th Dist.) (holding that “‘[w]hen

the performance period of a contract is undefined, the law implies a term assuming

that the parties intended that performance take place within a reasonable time’”).

Although the Market Square Development Agreement states that

“time is of the essence,” the contract does not provide a specified time for

performance. The question, therefore, is whether CP exercised its right of refusal

within a reasonable time under the circumstances. Id. “The issue of ‘[w]hat

constitutes a reasonable time for performance is an issue of fact to be determined by

the conditions and circumstances under which the parties executed their agreement

and contemplated performance.’” Garofoli at ¶ 35, quoting Lewis at ¶ 19. See also

Koon v. Hoskins, 1996 Ohio App. LEXIS 346, *19 (4th Dist. Jan. 24, 1996), citing 18

Ohio Jur.3d, [Contracts] § 197 (1980) (“Whether the question of what is a reasonable

time is a factual question or a legal question depends upon the nature of the

transaction, but it is usually a question of fact for the jury.”). Therefore, whether CP

exercised its right of first refusal is a fact question not conducive to resolution by

summary judgment.

We nevertheless find that the City’s second argument, regarding the

additional conditions provided with CP’s offer, is dispositive of this assigned error.

A right of first refusal is generally defined as “a promise to present

offers to buy property made by third parties to the promisee in order to afford the

promisee an opportunity to match the offer.” Latina v. Woodpath Dev. Co., 57 Ohio

St.3d 212, 212 (1991). A right of first refusal is a contract term subject to ordinary

contract principles. Halpern v. Smith, 2023-Ohio-1370, ¶ 21-22 (8th Dist.).

Ordinarily, a right of first refusal is a right to match all the terms and conditions

offered by a third-party buyer, not merely the stated price. W. Texas Transmission,

L.P. v. Enron Corp., 907 F.2d 1554, 1565 (5th Cir. 1990).

When the holder of a right of first refusal receives notice that the

property owner intends to sell the property to a third party, “the rightholder’s right

of first refusal matures into an option for which the third-party offer generally

dictates the terms.” W. Texas Transmission at 1565. See also 77 Am.Jur.2d, Vendor

and Purchaser, § 49 (1975).

However, some courts have allowed purchasers to exercise their

preemptive rights solely by matching the price term offered by a third party.

W. Texas Transmission at 1564. “In most of those cases, however, the contract

which created the preemptive right specified that price would be the only relevant

term.” Id., citing Kroehnke v. Zimmerman, 171 Colo. 365, 467 P.2d 265 (1970) (“If

during the term of this lease . . . the lessors . . . should desire to sell said demised

premises, then the lessees . . . shall have the privilege of purchasing the same for the

same price for which the lessors would be willing to sell to any other person.”); Schmidt v. Downs, 775 P.2d 427, 430 (Utah App. 1989); Wilson v. Whinery, 37

Wash.App. 24, 678 P.2d 354 (1984).

The right of first refusal at issue here, states in relevant part:

The City shall have the right at any time following the completion of the

Project to convey the Parcels and the Project to an unrelated third

party, provided that the [CP] shall have a right of first refusal to acquire

the Parcels and Project from the City at the same price offered by such

third party.

This is a “price-only” provision because it does not expressly require acceptance of

all the terms provided in the third-party buyer’s offer. If the parties had intended

acceptance of all the terms and conditions in the third-party buyer’s offer, it could

have written such a requirement into the agreement, but it did not. Therefore, CP

could have exercised its right of first refusal solely by matching E&C’s price.

CP matched E&C’s price, but its offer included additional terms and

conditions that were not provided in either E&C’s offer or in the right of refusal.

When a holder of a right of first refusal purports to accept a sale price but modifies

or adds other nonprice conditions, “the preemptive lapses because the rightholder

has failed to make a valid acceptance.” W. Texas Transmission at 1564. A

rightholder’s purported acceptance of the purchase price that “modifies, adds to or

otherwise qualifies the terms of the offer, generally constitutes a rejection of the

option and a counter-offer.” Id., citing Austin Presbyterian Theological Seminary

v. Moorman, 391 S.W.2d 717 (Tex. May 19, 1965); Hutcherson v. Cronin, 426

S.W.2d 638 (Tex. 12th Dist. Mar. 28, 1968); Lambert v. Taylor Tel. Co-Operative,

276 S.W.2d 929 (Eastland Tex. Mar. 11, 1955); Brownies Creek Collieries, Inc. v. Asher Coal Mining Co., 417 S.W.2d 249, 252 (Ky. June 30, 1967); N.W. Television

Club v. Gross Seattle Inc., 96 Wash. 2d 973 (Wa. Oct. 1, 1981); Matson v. Emory, 36

Wash. App. 681 (Feb. 21, 1984).

The rationale behind this strict rule is both practical and structural.

The rule allows the seller to remain “master of the conditions under which he will

relinquish his interest.” W. Texas Transmission at 1563. Allowing selective

matching on the part of a rightholder would undermine the seller’s ability to obtain

the full value of the bargain negotiated with the third party. See Miller v. LeSea

Broadcasting, Inc., 87 F.3d 224 (1996) (holding that without the requirement of

exact matching, the right of first refusal “is an impediment to the marketability of

property, because it gives the holder of the right a practical power to impede a sale

to a third party by refusing to match the third party’s offer exactly and then arguing

that the discrepancy was immaterial”).

In exercising its right of first refusal, CP sent a letter to Westlake,

dated November 20, 2024, offering to purchase the Market Square property for

$2,600,000, the same price offered by E&C. However, the right of first refusal

included the conditions that (1) the property would be exempt from property tax,

and (2) “the Purchase Price will be eligible for reimbursement from the Crocker Park

Phase 3 waterfall.” (Verified amended complaint, Exhibit Q.) These additional

terms and conditions constituted (1) a rejection of the offer that was based on the

third-party buyer’s price and (2) a counteroffer to purchase the property with

additional terms. Because CP never accepted the offer to purchase the property for $2,600,000, reasonable minds can only conclude that CP failed to properly exercise

its right of first refusal within a reasonable time. Therefore, the trial court erred as

a matter of law when it declared that CP did not waive its right of first refusal.

Accordingly, the fifth assignment of error is sustained.

The trial court’s judgment is affirmed in part and reversed in part. The

case is remanded to the trial court for further proceedings.

It is ordered that appellees and appellant share costs herein taxed.

The court finds there were reasonable grounds for this appeal.

It is ordered that a special mandate issue out of this court directing the

common pleas court to carry this judgment into execution.

A certified copy of this entry shall constitute the mandate pursuant to Rule 27

of the Rules of Appellate Procedure.

EILEEN T. GALLAGHER, PRESIDING JUDGE

EMANUELLA D. GROVES, J., and

MARY J. BOYLE, J., CONCUR