Harris County, Texas v. United States Environmental Protection Agency

2026-09-22

Authorities cited

Opinion

majority opinion

UNITED STATES DISTRICT COURT

FOR THE DISTRICT OF COLUMBIA

HARRIS COUNTY, TEXAS,

Plaintiff,

v.

Civil Action No. 25-cv-3646 (TSC)

UNITED STATES ENVIRONMENTAL

PROTECTION AGENCY, et al.,

Defendants.

MEMORANDUM OPINION

On August 7, 2025, the Environmental Protection Agency (“EPA”) terminated its sevenbillion-dollar Solar for All (“SFA”) competitive grant program. Plaintiff Harris County, an SFA

grant recipient, sued EPA and agency administrators, alleging that EPA’s termination of SFA

violated the One Big Beautiful Bill Act (“OBBBA”), the Administrative Procedure Act (“APA”),

and the Constitution. Plaintiff and Defendants have moved for summary judgment. For the

reasons set forth below, the court will GRANT IN PART and DENY IN PART Plaintiff’s and

Defendants’ motions.

I. BACKGROUND

The 2022 Inflation Reduction Act added § 134 to the Clean Air Act (“CAA”), which

appropriated $26.97 billion to EPA for a Greenhouse Gas Reduction Fund (“GGRF”). See 42

U.S.C. § 7434(a)–(c) (repealed 2025). The GGRF included a seven-billion-dollar competitive

grant program, available until September 30, 2024, for EPA “to enable low-income and

disadvantaged communities to deploy or benefit from zero-emission technologies . . . and to carry

out other greenhouse gas emission reduction activities.” Id. § 7434(a)(1). Congress also

Page 1 of 19

appropriated $30 million to EPA “for administrative costs necessary to carry out activities” under

the GGRF, available until September 30, 2031. Id. § 7434(a)(4).

In 2023, EPA announced the SFA program to implement § 134 and to “advance the BidenHarris Administration’s equity and environmental justice priorities.” AR 347. Through SFA, EPA

awarded grants “to expand the number of low-income and disadvantaged communities primed for

distributed solar investment.” AR 348. EPA selected Plaintiff to receive a $249.7 million SFA

grant and executed an initial award agreement in July 2024 and an amended agreement in

December 2024. See AR 427–510. EPA obligated the full award before the statutory deadline,

and Plaintiff’s approved workplan allocated those funds across a five-year project period. 1 See

AR 519–72. The award was then made available to Plaintiff through the Treasury’s Automated

Standard Application for Payments (“ASAP”) system, and Plaintiff began drawing down funds in

December 2024. Pl.’s Mot. at 4–5, ECF No. 32.

On July 4, 2025, President Trump signed the OBBBA. Section 60002 of the Act provides:

Section 134 of the Clean Air Act (42 U.S.C. 7434) is repealed and the unobligated balances

of amounts made available to carry out that section (as in effect on the day before the date

of enactment of this Act) are rescinded.

Pub. L. No. 119-21, 139 Stat. 72, 154 (2025).

At 5:20 a.m. on August 7, 2025, EPA Associate Deputy Administrator Travis Voyles

emailed Deputy Administrator David Fotouhi a memorandum interpreting OBBBA’s impact on

SFA (“Decisional Memorandum”). The memorandum recommended “that the Agency terminate

1

Federal law distinguishes among appropriations, obligations, and disbursements. An appropriation is Congress’s authorization for an agency “to incur obligations and to make payments out of the Treasury for specified purposes.” Andrus v. Sierra Club, 442 U.S. 347, 361 n.18 (1979). An obligation is the agency’s binding commitment of appropriated funds—here, the executed grant agreement—which creates a legal liability even though no money has left the Treasury. See Maine Cmty. Health Options v. United States, 590 U.S. 296, 307–08 (2020). A disbursement is the payment itself.

Page 2 of 19

the Solar for All (SFA) program and all existing grants because the EPA no longer has a statutory

basis or dedicated funding to continue administering and overseeing the nearly $7 billion outlay

to approximately 60 grant recipients.” AR 88. Three hours later, Fotouhi responded that he

“agree[d] with the recommendation to terminate the SFA program and existing grants” and

instructed Voyles to “proceed accordingly.” Id. Voyles promised to “work to immediately

implement the termination of the SFA program and existing grants.” Id.

That evening, EPA sent identical termination notices to each SFA grant recipient,

announcing its “decision to terminate the SFA program and existing grants” because OBBBA

“repeal[ed] . . . the statutory authorization and all appropriated funding for the program,” making

“any attempt to continue the program’s administration . . . no longer legally permissible.” AR 136.

The next day, Plaintiff was blocked from drawing down its grant funds, and its ASAP account

status changed to “Suspended.” On August 18, 2025, the status changed again, from “Suspended”

to “Liquidated.” Pl.’s Mot. at 11.

On August 27, 2025, Plaintiff filed an administrative appeal with EPA’s Disputes Decision

Official, objecting to the termination of its SFA grant. Pl.’s Ex. T, ECF No. 32-23; see 2 C.F.R. §

1500.15. Plaintiff alleged that “EPA’s sole basis for termination . . . is wrong” and requested that

“the agency immediately reinstate [its] award.” Pl.’s Ex. T at 2–3.

Plaintiff filed suit in October 2025, and the parties agreed to stay Plaintiff’s administrative

appeal pending this court’s judgment. Pl.’s Mot. at 12–13. Defendants filed a declaration from

EPA’s Deputy Chief Financial Officer Gregg Treml confirming that all undisbursed SFA grant

funds will remain “in the same Treasury Account used to manage the Solar for All grant program”

until September 30, 2031. Treml Decl. ¶¶ 5–7, ECF No. 20-1. Defendants “confirm[ed] that

closeout will not proceed” until this court renders judgment. Notice of Withdrawal of Mot. at 2,

Page 3 of 19

ECF No. 21.

II. LEGAL STANDARDS

The APA authorizes judicial review of final agency action and instructs a reviewing court

to “hold unlawful and set aside” such action if it finds it to be “arbitrary, capricious, an abuse of

discretion, or otherwise not in accordance with law”; “contrary to constitutional right, power,

privilege, or immunity”; or “in excess of statutory jurisdiction, authority, or limitations, or short

of statutory right.” 5 U.S.C. § 706(2)(A)–(C). The arbitrary-and-capricious standard is “highly

deferential” and “presumes the agency’s action to be valid.” Env’t Def. Fund, Inc. v. Costle, 657

F.2d 275, 283 (D.C. Cir. 1981). A court will not disturb an agency’s determination as long as the

agency “examine[d] the relevant data and articulate[d] a satisfactory explanation for its action

including a ‘rational connection between the facts found and the choice made.’” Motor Vehicle

Mfrs. Ass’n v. State Farm Mut. Auto. Ins., 463 U.S. 29, 43 (1983) (quoting Burlington Truck Lines,

Inc. v. United States, 371 U.S. 156, 168 (1962)).

While the APA mandates deferential review of agency policymaking and factfinding,

courts employ “no deferential standard” in answering “legal questions.” Loper Bright Enters. v.

Raimondo, 603 U.S. 369, 392 (2024). Instead, courts “must exercise their independent judgment

in deciding whether an agency has acted within its statutory authority.” Id. at 412. “When the

best reading of a statute is that it delegates discretionary authority to an agency, the role of the

reviewing court under the APA is, as always, to independently interpret the statute and effectuate

the will of Congress subject to constitutional limits.” Id. at 395. “The court fulfills that role by

recognizing constitutional delegations, fixing the boundaries of the delegated authority, and

ensuring the agency has engaged in reasoned decisionmaking within those boundaries.” Id.

Page 4 of 19

(cleaned up).

“In APA cases such as this one, involving cross-motions for summary judgment, ‘the

district judge sits as an appellate tribunal [and] [t]he entire case on review is a question of law.’”

Kondapally v. U.S. Citizenship & Immigr. Servs., 557 F. Supp. 3d 10, 20 (D.D.C. 2021) (quoting

Am. Bioscience, Inc. v. Thompson, 269 F.3d 1077, 1083 (D.C. Cir. 2001)). The court must decide,

as a matter of law, “whether the agency action is supported by the administrative record and

otherwise consistent with the APA standard of review.” Coe v. McHugh, 968 F. Supp. 2d 237,

240 (D.D.C. 2013).

III. DISCUSSION

A. Tucker Act Jurisdiction

As an initial matter, Defendants contend that the Tucker Act, 28 U.S.C. §§

1346(a) and 1491, deprives the court of subject matter jurisdiction to consider Plaintiff’s claims.

“It rests with Congress to determine not only whether the United States may be sued, but

in what courts the suit may be brought.” Franklin-Mason v. Mabus, 742 F.3d 1051, 1054 (D.C.

Cir. 2014) (quoting Minnesota v. United States, 305 U.S. 382, 388 (1939)). The APA’s waiver of

sovereign immunity for suits against federal agencies “seeking relief other than money damages”

does not apply where another statute “expressly or impliedly forbids the relief which is sought.”

5 U.S.C. § 702. The Tucker Act is such a statute: it vests the Court of Federal Claims with

exclusive jurisdiction over claims exceeding $10,000 that are founded on an “express or implied

contract with the United States.” 28 U.S.C. § 1491(a)(1); see id. § 1346(a)(2). That said, “a district

court’s jurisdiction ‘is not barred by the possibility’ that an order setting aside an agency’s action

may result in the disbursement of funds.” Dep’t of Educ. v. California, 604 U.S. 650, 651 (2025)

(quoting Bowen v. Massachusetts, 487 U.S. 879, 910 (1988)). To determine whether a claim must

Page 5 of 19

proceed in the Court of Federal Claims, the court must decide if the action “is at its essence a

contract claim,” which turns “both on the source of the rights upon which the plaintiff bases its

claims, and upon the type of relief sought.” Crowley Gov’t Servs., Inc. v. Gen. Servs. Admin., 38

F.4th 1099, 1107 (D.C. Cir. 2022) (quoting Megapulse, Inc. v. Lewis, 672 F.2d 959, 967–68 (D.C.

Cir. 1982)). Both prongs of the Megapulse test must be satisfied—that is, the plaintiff’s “asserted

right” must be “based in contract” and the plaintiff must seek “‘in essence’ more than $10,000 in

monetary relief from the federal government”—to deprive a district court of jurisdiction. Crowley,

38 F.4th at 1113; see Am. Acad. of Pediatrics v. Dep’t of Health & Hum. Servs., 816 F. Supp. 3d

27, 47 (D.D.C. 2026).

Plaintiff challenges EPA’s “policy-level determination” that it is “‘no longer legally

permissible’ to operate the SFA program after OBBBA” (“Elimination Decision”), Pl.’s Mot. at

18–19, set out in the Decisional Memorandum, AR 89–96. Defendants characterize Plaintiff’s

claims as “disguised contract claims that belong in the Court of Federal Claims.” Def.’s Mot. at

12. The court disagrees. Plaintiff’s rights arise from statute rather than from the terms of its grant

agreement, and the relief it seeks is neither damages nor specific performance. The Tucker Act

poses no jurisdictional bar.

Recent per curiam stay orders from the Supreme Court’s emergency docket have grappled

with the application of these jurisdictional principles in the context of grant terminations. See

Dep’t of Educ., 604 U.S. at 651; NIH v. Am. Pub. Health Ass’n, 145 S. Ct. 2658 (2025). Of

relevance here, Justice Barrett’s controlling opinion in NIH distinguished between “challenges to

the grant terminations” themselves and challenges to the underlying “guidance” documents

describing agency priorities or internal policies. 145 S. Ct. at 2661 (Barrett, J., concurring). While

a district court may not “‘vacate[]’ the grant terminations and order[] the Government to pay

Page 6 of 19

plaintiffs sums due under the agreements,” it may order “vacatur of internal agency guidance on

arbitrary-and-capricious grounds.” Id. As a result, “this court cannot review past grant

terminations, but the Tucker Act does not deprive it of jurisdiction to vacate and prospectively

enjoin unlawful policies concerning such terminations or decisions to cut funds appropriated by

Congress—decisions which do not sound in contract.” New Mexico v. Musk, 824 F. Supp. 3d 80,

93 (D.D.C. 2026).

The first prong of the Megapulse test looks to the “source of the rights upon which the

plaintiff bases its claims.” 672 F.2d at 968. The D.C. Circuit has rejected the position “that any

case requiring some reference to or incorporation of a contract . . . necessarily” belongs in the

Court of Federal Claims. Id. at 967–68. The question is instead “whether, despite the presence

of a contract, plaintiffs’ claims are founded only on a contract, or whether they stem from a

statute.” Transohio Sav. Bank v. Dir., Off. of Thrift Supervision, 967 F.2d 598, 609 (D.C. Cir.

1992). To answer that question, the court considers whether the “asserted rights and the

government’s purported authority arise from statute” and exist “apart from rights created under the

contract” and whether the plaintiff “seeks to enforce any duty imposed upon the government by

the relevant contracts.” Crowley, 38 F.4th at 1107 (cleaned up). If a plaintiff’s claim depends not

on whether its contract was breached, “but on whether the agency’s policy directives were

unlawful in the face of federal statutes appropriating funds for specific purposes,” it is not in

essence contractual. Widakuswara v. Lake, No. 25-5144, 2025 WL 1288817, at *14 (D.C. Cir.

May 3, 2025) (Pillard, J., dissenting), adopted en banc, 2025 WL 1521355, at *1 (D.C. Cir. May

28, 2025); see Crowley, 38 F.4th at 1109–10.

The source of Plaintiff’s rights is not contractual. Its claims arise from rights protected not

by the terms of its grant agreement, but by statute—the APA, CAA, and OBBBA—and those

Page 7 of 19

rights exist independently of the award agreements. That Plaintiff “has no claim to grant funds or

continued participation in any SFA program except through its federal grant,” Def.’s Mot. at 17,

is not dispositive, because “determining whether [EPA] infringed [Plaintiff’s] rights as alleged in

the complaint requires primarily an examination of the statutes the [EPA] has purportedly violated,

not of [Plaintiff’s] contract,” Crowley, 38 F.4th at 1108–09. Plaintiff argues that EPA’s reading

of § 60002—under which OBBBA rescinded obligated as well as unobligated funds—contradicts

the statute’s plain language. The claim turns on statutory language, not on specific conditions or

promises from the government contained in its grant. In that sense, Plaintiff’s claim exists “apart

from” and does not seek to “enforce” contractual terms. Id. at 1107. 2

The relief Plaintiff seeks—vacatur of the Elimination Decision and an injunction

preventing EPA from “shutting down the SFA program absent congressional authorization”—is

likewise not contractual. Proposed Order at 2, ECF No. 32-24. Neither form of relief would direct

EPA to pay Plaintiff anything or to reinstate its grant. Vacatur setting aside the agency’s

interpretation of OBBBA would return the question of Plaintiff’s grant to EPA, which would retain

discretion to reconsider the termination, terminate again on adequate grounds, or reach any other

outcome the statute permits. The proposed injunction is prohibitory: it would restrain EPA from

further implementing an unlawful decision, not compel it to perform. Plaintiff thus “seeks neither

the prototypical contract remedy of damages nor the classic contractual remedy of specific

performance.” Crowley, 38 F.4th at 1110 (cleaned up). As Megapulse explained, the rule against

contract actions seeking specific performance is one thing; it is “quite another” to say “that an

2

Having determined that Plaintiff’s claims do not meet the first condition of the Megapulse test for exclusive jurisdiction in the Court of Federal Claims, the analysis could end here. See Am. Acad. of Pediatrics, 816 F. Supp. 3d at 47. For completeness, the court nonetheless considers the second prong and determines that it is also not met.

Page 8 of 19

agency action may not be enjoined, even if in clear violation of a specific statute, simply because

that same action might also amount to a breach of contract.” 672 F.2d at 971. Whether an

injunction is warranted as a matter of equitable discretion is a separate question, addressed below.

Plaintiff’s requested relief may ultimately help it prevail in its administrative dispute and

recover its grants. But “[t]he fact that [Plaintiff] may obtain monetary relief from the United States

in Claims Court if it succeeds in its suit against [EPA] in district court ‘is insufficient to deprive

the district court of jurisdiction.’” Crowley, 38 F.4th at 1112 (quoting Smalls v. United States, 471

F.3d 186, 190 (D.C. Cir. 2006)).

B. Article III Standing

“For a lawsuit to constitute a case within the meaning of Article III, the plaintiff must have

standing to sue.” Diamond Alternative Energy, LLC v. EPA, 606 U.S. 100, 110 (2025). “In other

words, plaintiffs must show that they possess a personal stake in the dispute and are not mere

bystanders.” Id. (cleaned up). “‘[T]he irreducible constitutional minimum of standing contains

three elements’: injury in fact, causation, and redressability.” Id. at 111 (quoting Lujan v. Defs. of

Wildlife, 504 U.S. 555, 560 (1992)). The last requires the plaintiff to demonstrate “that the injury

would likely be redressed by judicial relief.” TransUnion LLC v. Ramirez, 594 U.S. 413, 423

(2021). “[T]he manner and degree of evidence required” to establish standing varies depending

on the “stage[] of the litigation.” Lujan, 504 U.S. at 561.

Defendants argue that Plaintiff cannot demonstrate redressability because “the only legally

cognizable injury it experienced” was “lost grant funds,” which the parties agree the court cannot

restore. Def.’s Mot. at 24. But Plaintiff does not ask the court to restore its grant. It asks the court

to set aside the agency’s interpretation of OBBBA, which would “clear the way for [Plaintiff] to

prevail in its administrative dispute challenging” its grant termination. Pl.’s Mot. at 23–24.

Page 9 of 19

“The law is clear that a party has standing to pursue a claim so long as the relief sought

will constitute a ‘necessary first step on a path that could ultimately lead to relief fully redressing

the [claimant’s] injury.’” Duberry v. District of Columbia, 924 F.3d 570, 583 (D.C. Cir. 2019)

(quoting Power Co. of Am. v. FERC, 245 F.3d 839, 842 (D.C. Cir. 2001)). Power Co. itself

illustrates this principle. The plaintiff there challenged an agency’s acquiescence in other parties’

termination of the plaintiff’s contracts without adequate notice, though its “ultimate injury” was

the contract cancellations themselves. 245 F.3d at 842. The agency had determined that the

agreements were not subject to a notice requirement, foreclosing any administrative remedy. Id.

The court concluded that “a declaratory ruling that the terminations at issue are subject to the notice

requirement” was a “necessary first step on a path that could ultimately lead to relief fully

redressing the injury.” Id. (quoting Tel. & Data Sys., Inc. v. FCC, 19 F.3d 42, 47 (D.C. Cir. 1994)).

While the plaintiff might not ultimately prevail in obtaining an agency remedy, it could not attempt

to do so without a declaratory ruling. See Power Co., 245 F.3d at 842. That was “enough to ensure

that the relief requested ‘will produce tangible, meaningful results in the real world.’” Tel. & Data

Sys., 19 F.3d at 47 (quoting Common Cause v. Dep’t of Energy, 702 F.2d 245, 254 (D.C. Cir.

1983)).

So too here. Plaintiff’s ultimate injury is the termination of its grant funding, and vacatur

would not directly restore it. But Defendants do not dispute that the administrative appeal would

be “plainly futile” if the Elimination Decision stands. See Def.’s Mot. at 25–26. Because setting

aside the decision would remove that barrier to relief, Plaintiff has met its burden of showing that

doing so could “ultimately lead to relief fully redressing the injury.” Power Co., 245 F.3d at 842.

C. Final Agency Action

Defendants make a related argument that the pendency of Plaintiff’s administrative dispute

Page 10 of 19

means there is no final agency action to review under 5 U.S.C. § 704. Def.’s Mot. at 26. This too

mistakes the agency action at issue. Plaintiff does not seek review of the termination of its

individual grant; it challenges EPA’s policy-level determination that OBBBA rendered continued

operation of SFA legally impermissible, memorialized in the Decisional Memorandum. That

determination satisfies the familiar two-prong test set forth in Bennett v. Spear, 520 U.S. 154

(1997): it “mark[s] the ‘consummation’ of the agency’s decisionmaking process” on the question

of whether OBBBA stripped the agency of authority to administer SFA, and is not “of a merely

tentative or interlocutory nature.” Id. at 178 (quoting Chi. & S. Air Lines, Inc. v. Waterman S.S.

Corp., 333 U.S. 103, 113 (1948)).

The Decisional Memorandum set out EPA’s interpretation of OBBBA—namely, that the

statute “eliminate[d] the Agency’s substantive grantmaking authority” under CAA § 134, requiring

the agency to terminate the program and all existing grants. AR 90. The Deputy Administrator

approved it within hours, and EPA sent termination notices to grantees that same evening. AR 88,

130–38. EPA’s dispute process cannot revisit that determination: it reaches only an “Agency

Decision” transmitted by an “Action Official” to a particular affected entity. 2 C.F.R. §

1500.14(c). The decision was thus EPA’s “last word on the matter.” Whitman v. Am. Trucking

Ass’ns, 531 U.S. 457, 478 (2001).

The decision is also an action “by which ‘rights or obligations have been determined’ or

from which ‘legal consequences will flow.’” Bennett, 520 U.S. at 178 (quoting Port of Bos.

Marine Terminal Ass’n v. Rederiaktiebolaget Transatlantic, 400 U.S. 62, 71 (1970)). EPA’s

interpretation of OBBBA “was the agency’s reason for terminating the SFA grants,” Def.’s Mot.

at 19, and the agency has treated that interpretation as controlling how it may administer the

program. See Appalachian Power Co. v. EPA, 208 F.3d 1015, 1021 (D.C. Cir. 2000) (explaining

Page 11 of 19

that “a document issued at headquarters” is “for all practical purposes ‘binding’” if the agency

treats it as “controlling in the field” and bases its “actions on the policies or interpretations

formulated in the document”). Requiring Plaintiff to exhaust a process that cannot set aside the

legal basis for its grant termination would leave the parties in the same posture as now.

D. APA Challenge

Plaintiff’s central claim is that the agency’s determination that OBBBA § 60002 required

EPA to terminate the SFA grant program was arbitrary and capricious, contrary to law, and in

excess of statutory authority under the APA. See 5 U.S.C. § 706(2)(A), (C). The court agrees.

Starting with the text, the provision of CAA § 134 underlying Plaintiff’s SFA grant

provided:

“[T]here is appropriated to the Administrator for fiscal year 2022 . . . $7,000,000,000, to

remain available until September 30, 2024, to make grants, on a competitive basis . . . to

enable low-income and disadvantaged communities to deploy or benefit from zeroemission technologies . . . .”

42 U.S.C. § 7434(a)(1). By its express terms, this section tasked the government with making

grants—“to bring into being” or “lay out and construct” them. See Make, Merriam-Webster,

https://www.merriam-webster.com/dictionary/make (last visited Sept. 21, 2026). Defendants

concede that “EPA duly executed [§ 134] by making grants before the statutory deadline,” Def.’s

Mot. at 35, and that “SFA grants . . . were executed pre-OBBBA,” id. at 29. Indeed, EPA

announced a competitive award process in June 2023 to distribute the seven-billion-dollar

appropriation, selected 60 grantees, and obligated the full amount before the September 30, 2024,

deadline. AR 344–426. EPA’s statutory duty to “make” the grants was therefore complete by the

time OBBBA took effect.

Then came OBBBA § 60002, which stated:

Section 134 of the Clean Air Act (42 U.S.C. 7434) is repealed and the unobligated balances

Page 12 of 19

of amounts made available to carry out that section (as in effect on the day before the date

of enactment of this Act) are rescinded.

By its plain language, § 60002 had two operative effects: it (1) “repealed” the government’s

authority under CAA § 134 to make GGRF grants, and (2) “rescinded” certain funding to “carry

out” the GGRF. This is a far cry from authorizing—much less requiring—the government to claw

back funds that had already been obligated. 3

It is a “cardinal principle of statutory construction” that a statute ought to be construed such

that “no clause, sentence, or word shall be superfluous, void, or insignificant.” TRW Inc. v.

Andrews, 534 U.S. 19, 31 (2001) (quoting Duncan v. Walker, 533 U.S. 167, 174 (2001)). “[T]he

canon against surplusage is strongest when an interpretation would render superfluous another part

of the same statutory scheme.” Marx v. Gen. Revenue Corp., 568 U.S. 371, 386 (2013). If the

government is correct that § 60002’s “repealed” clause “did not implicitly incorporate or save any

aspect of Section 134,” Def.’s Mot. at 28, there would be no need to separately rescind EPA’s

administrative funding—it would already be repealed. That Congress included a separate

rescission clause shows that the two clauses do different work: the repeal ended EPA’s authority

to make new grants, and the rescission determined which appropriated funds Congress took back.

The canon of surplusage is complemented by the rule of expressio unius est exclusio

alterius, which directs “that expressing one item of an associated group excludes another item not

mentioned.” Esteras v. United States, 606 U.S. 185, 195 (2025). “[T]he canon against surplusage

and the expressio unius canon ‘are at their zenith when they apply in tandem,’ as they appear to

3

The parties dispute whether this question should be framed as OBBBA authorizing or requiring the rescission of Plaintiff’s grant funding. Both the Decisional Memorandum and the termination notices asserted that “Congress has made its intent clear . . . that the SFA program is no longer to operate.” AR 88. The court construes this contemporaneous rationale to mean what it says: that Defendants believed they were required to rescind Plaintiff’s funding.

Page 13 of 19

do here.” Nasdaq Stock Mkt. LLC v. SEC, 38 F.4th 1126, 1137 (D.C. Cir. 2022) (quoting Indep.

Ins. Agents of Am., Inc. v. Hawke, 211 F.3d 638, 645 (D.C. Cir. 2000)). As Plaintiff notes, by

rescinding only “unobligated balances” available to carry out § 134, Congress impliedly declined

to rescind obligated ones, meaning the provision left funds already obligated to grant recipients

undisturbed.

The legislative record confirms that reading. During the House Energy and Commerce

Committee’s markup, Representative Griffith returned to the point repeatedly:

I just want to point out that these provisions that we are talking about only apply as far, as

this bill is concerned, to the unobligated balances. So if a grant was already given, as far

as this bill is concerned, then that would still be going forward.

If the grant has already been granted and the money is obligated, then this—then our

language does not affect that.

[W]e can’t rescind expenditures that have already been obligated.

171 Cong. Rec. S4283 (daily ed. July 9, 2025). Committee Chair Guthrie said the same: section

60002 “does not close the grants on any obligated funds.” Id. And the Congressional Budget

Office scored the provision as saving $19 million in administrative and oversight funding, not

billions of dollars in already-obligated grants. Id. at S4282–83. It is clear that “legislators

intended Section 60002 to only rescind unobligated balances and to leave alone any funds already

distributed.” Arizona v. EPA, No. 2:25-cv-2015, 2026 WL 1533001, at *3 (W.D. Wash. June 1,

2026).

Nor does OBBBA’s rescission of EPA’s unobligated oversight funding justify terminating

obligated SFA grants. Defendants may be right that EPA’s “decision not to use other sources of

funding” to continue overseeing grants is unreviewable because OBBBA supplies “no meaningful

standard against which to judge the agency’s exercise of discretion.” Def.’s Mot. at 37 (quoting

Page 14 of 19

Heckler v. Chaney, 470 U.S. 821, 830 (1985)). Judgments about how “resources are best spent”

or how any particular grant “fits the agency’s overall policies” are ones EPA “is far better equipped

than the courts” to make. Heckler, 470 U.S. at 831. But “an agency is not free simply to disregard

statutory responsibilities: Congress may always circumscribe agency discretion to allocate

resources by putting restrictions in the operative statutes.” Lincoln v. Vigil, 508 U.S. 182, 193

(1993). Nor should courts “infer that Congress has implicitly repealed or suspended statutory

mandates based simply on the amount of money Congress has appropriated.” In re Aiken County,

725 F.3d 255, 260 (D.C. Cir. 2013). Whatever the practical consequences of Congress’s rescission

of unobligated administrative funds, they do not change the fact that Congress expressly chose to

leave obligated grant funds undisturbed.

Because EPA’s termination of the SFA program rested on a contrary reading—that § 60002

reached obligated funds as well—the Elimination Decision both exceeded the agency’s statutory

authority and was arbitrary and capricious. See, e.g., Gomez v. Trump, 485 F. Supp. 3d 145, 194

(D.D.C. 2020) (“Agency action that ‘stands on a faulty legal premise and [lacks] adequate

rationale’ is arbitrary and capricious.” (quoting See Prill v. NLRB, 755 F.2d 941, 948 (D.C. Cir.

1985)); Filazapovich v. Dep’t of State, 560 F. Supp. 3d 203, 243 (D.D.C. 2021) (“The prioritization

scheme . . . is arbitrary and capricious because it relied on an erroneous interpretation of the law.”).

E. Ultra Vires and Constitutional Claims

As to Plaintiff’s ultra vires and constitutional claims, the court will grant Defendants’

motion. Ultra vires review is only available where “there is no alternative procedure for review

of the statutory claim.” Changji Esquel Textile Co. v. Raimondo, 40 F.4th 716, 722 (D.C. Cir.

2022). Plaintiff’s ultra vires claims are based on the same allegations that undergird its APA

claims—that Defendants terminated the SFA program in contravention of the CAA and OBBBA.

Page 15 of 19

See Pl.’s Mot. at 21. Because the APA supplies an avenue for review for those allegations and the

remedies Plaintiff seeks, the ultra vires claims are duplicative. See Lewis v. U.S. Parole Comm’n,

743 F. Supp. 3d 181, 201 (D.D.C. 2024).

Plaintiff’s constitutional claims fare no better. Plaintiff alleges that Defendants’

cancellation of the SFA program violated the Appropriations and Presentment Clauses and the

separation of powers. See Pl.’s Mot. at 40–42. The substance of Plaintiff’s argument is that EPA’s

retroactive interpretation of OBBBA § 60002 “‘create[d] a different law’ than that voted on by

Congress,” id. at 41 (quoting Clinton v. City of New York, 524 U.S. 417, 448 (1998)), and

disregarded the appropriation Congress mandated in CAA § 134, id. at 40–41. This attempt to

assert non-statutory rights to vindicate separation-of-powers principles is foreclosed by Dalton v.

Specter, 511 U.S. 462 (1994). “[C]laims simply alleging that the President has exceeded his

statutory authority are not ‘constitutional’ claims, subject to judicial review.” Id. at 473. Plaintiff’s

theory from the outset—with which the court has agreed—has been that EPA misread § 60002,

which left intact § 134 funds that had already been obligated. Those statutory violations are the

“predicate acts for the constitutional claims,” Glob. Health Council v. Trump, 153 F.4th 1, 15 (D.C.

Cir. 2025) (amended): without § 134’s appropriation and § 60002’s limited rescission of it, there

would be no constitutional claim to bring. Dalton therefore controls here and Plaintiff lacks a

cause of action to bring freestanding constitutional claims “predicated on underlying statutory

violations.” Id. at 17.

F. Remedy

Plaintiff asks the court to vacate the Elimination Decision and permanently enjoin

Defendants from “shutting down the SFA program absent congressional authorization.” Proposed

Order at 1–2.

Page 16 of 19

For the reasons explained above, the Elimination Decision is arbitrary and capricious,

contrary to law, and in excess of statutory authority. 5 U.S.C. § 706(2)(A), (C). The APA

mandates that the court “set aside” the challenged agency action. Id. § 706. Vacatur is the ordinary

and presumptive remedy for substantive violations of the APA. See Allina Health Servs. v.

Sebelius, 746 F.3d 1102, 1110 (D.C. Cir. 2014); Ill. Pub. Telecomms. Ass’n v. FCC, 123 F.3d 693,

693 (D.C. Cir. 1997). Although courts in this Circuit have at times remanded without vacatur, see

Allied-Signal, Inc. v. U.S. Nuclear Regulatory Comm’n, 988 F.2d 146, 150–51 (D.C. Cir. 1993),

Defendants have forfeited any argument that such a remedy is warranted by raising it for the first

time in their reply brief. See Def.’s Reply at 22; Comm’r v. Simmons, 646 F.3d 6, 11 (D.C. Cir.

2011) (“Appearing as it does for the first time in the reply brief, the argument is forfeit and we do

not address it.”).

Defendants also ask the court to “vacate EPA’s termination decision only with respect to

Harris County’s SFA Grant.” Def.’s Mot. at 44. But that is not the agency action before the court.

Plaintiff does not challenge the termination of its individual grant, and the court has not reviewed

it. What the court sets aside is the agency’s policy-level determination that OBBBA rendered

continued operation of SFA legally impermissible—applicable to the program as a whole. AR 88.

“When a reviewing court determines that agency regulations are unlawful, the ordinary result is

that the rules are vacated—not that their application to the individual petitioners is proscribed.”

Harmon v. Thornburgh, 878 F.2d 484, 495 n.21 (D.C. Cir. 1989). Trump v. CASA, Inc., 606 U.S.

831 (2025), does not counsel otherwise. See Def.’s Reply at 25. CASA addressed universal

injunctions and expressly declined to address vacatur under the APA, recognizing that an order

affording complete relief to the plaintiff may incidentally benefit nonparties. See CASA, 606 U.S.

at 847 n.10, 851–52. Vacatur operates on the agency action itself. Its effect on other grantees

Page 17 of 19

follows from the nature of the action, not from any extension of relief beyond the parties.

That leaves the question of whether issuance of an injunction is also warranted. The

Supreme Court has cautioned that a district court vacating an agency action under the APA should

not issue an injunction unless doing so would “have [a] meaningful practical effect independent of

its vacatur.” Monsanto Co. v. Geertson Seed Farms, 561 U.S. 139, 165 (2010).

“An injunction is a drastic and extraordinary remedy, which should not be granted

as a matter of course” or where “a less drastic remedy . . . [is] sufficient to redress” the plaintiff’s

injury. Id. at 165–66. These principles counsel against injunctive relief here. Vacatur deprives

the Elimination Decision of legal effect: EPA may take no further action premised on the ground

that OBBBA § 60002 requires or authorizes the program’s termination. The court will not presume

that EPA would disregard such an order. The agency has represented that SFA funds will remain

in a Treasury account through September 30, 2031, and has stayed both Plaintiff’s administrative

appeal and the closeout process pending this litigation. Treml Decl. ¶¶ 5–7; Def.’s Mot. at 10.

Plaintiff’s evidence of the administration’s hostility to GGRF programs shows that EPA opposed

SFA; it does not show that the agency would defy a judgment of this court.

Accordingly, the court will vacate the Elimination Decision but deny without prejudice

Plaintiff’s request for an injunction. Should EPA fail to comply with the vacatur ordered today—

including by proceeding with closeout of SFA grants on the ground that § 60002 requires or

authorizes that result—the court will consider further relief.

IV. CONCLUSION

For the foregoing reasons, Plaintiff’s motion for summary judgment, ECF No. 32, will be

GRANTED IN PART and DENIED IN PART, and Defendants’ cross-motion, ECF No. 38, will

also be GRANTED IN PART and DENIED IN PART. An order consistent with this

Page 18 of 19

Memorandum Opinion will be entered separately.

Date: September 22, 2026

Tanya S. Chutkan

TANYA S. CHUTKAN

United States District Judge

Page 19 of 19