ARKANSAS COURT OF APPEALS

DIVISIONS I & IV

No. CV-25-110

ARKANSAS STATE HIGHWAY Opinion Delivered October 28, 2026

COMMISSION

APPELLANT APPEAL FROM THE FAULKNER

COUNTY CIRCUIT COURT

V. [NO. 23CV-15-754]

HONORABLE SUSAN K. WEAVER,

WILLIAM LEWIS AND CODY LEWIS, JUDGE

CO-TRUSTEES OF THE WILLIAM

MAJOR LEWIS TRUST U/T/D

12/21/2000

APPELLEES AFFIRMED

MIKE MURPHY, Judge

This is an eminent-domain appeal from a $3 million jury verdict entered in the

Faulkner County Circuit Court in favor of the property owners, appellees William Major

Lewis and Cody Lewis, as co-trustees of the William Major Lewis Trust (hereinafter “the

Lewises”) against the appellant Arkansas State Highway Commission. The case concerned a

condemnation and taking of portions of land owned by the trust. On appeal, the Highway

Commission argues that (1) the court erred when it allowed testimony regarding roads and

roundabouts the Lewises claimed they had to build due to the taking; (2) substantial evidence

does not support the verdict; and (3) the amount and manner in which attorney’s fees were

awarded was improper. We affirm.

I. Facts and Procedural History

On August 7, 2015, the Highway Commission condemned portions of two tracts

owned by the Lewises, taking a right-of-way and controlling access across both. The taking

eliminated the tracts’ direct, unrestricted frontage access to Dave Ward Drive, which the

Lewises and their tenant had used to reach the property before the taking. After the taking,

the Lewises were limited to an unpaved, unimproved road on the east side and an access

point on the old Amity Road on the west side of tract 1. The Highway Commission deposited

$417,825 into the registry of the court as its estimate of just compensation.

The case proceeded through several years of appraisal work and discovery before its

first pretrial hearing. On April 9, 2018, the circuit court heard the parties’ cross-motions in

limine and, as relevant here, granted the Lewises’ motion to admit evidence of the cost of

constructing replacement roads and roundabouts to restore access to Dave Ward Drive. The

court simultaneously denied the Highway Commission’s motion to exclude that evidence. It

admitted proof that the Lewises spent roughly $4–$4.5 million constructing a relocated

Amity Road and an east-west connector road, which the City of Conway required before it

would authorize any road restoring access to the Dave Ward Drive-fronting remainder. The

court found that the Lewises could not use the cost-to-cure or betterment evidence directly

as the measure of damages but could otherwise present evidence of the roads and their cost

at trial.

2

The Highway Commission renewed its motion in limine on May 2, 2024, again

seeking to exclude the Lewises’ cost-to-cure evidence. The circuit court again denied the

motion, and the case proceeded to a jury trial beginning June 4.

At trial, the Lewises’ appraiser, Diana Thompson, opined that the total amount of

just compensation for both tracts was $3.8869 million using a comparable-sales approach

with adjustments for size, location, and time and, for tract 1, an income-capitalization

approach reflecting the lost rental income when the Lewises’ tenant relocated. Trustee Cody

Lewis gave lay-opinion testimony that the market value of tract 1 was $16 a square foot (about

$14 million) before the taking and $10 a square foot after the taking (about $8.564 million).

Lewis testified that the market value of tract 2 was $14 a square foot (about $4.592 million)

before the taking and $8 a square foot (about $2.411 million) after the taking. He explained

that the City of Conway required the Lewises to build a relocated Amity Road and

connecting drive at a cost of several million dollars before they could make commercial use

of the property abutting Dave Ward Drive. They additionally had to use seven acres from

their remaining land for the construction. Audie Alumbaugh, the Lewises’ accountant,

echoed this testimony. At the close of the Lewises’ case, the circuit court denied the Highway

Commission’s motion for a directed verdict, explaining that the Highway Commission’s

objections went “to the credibility and weight for the jury to give” the evidence.

The Highway Commission’s appraiser, Cheslyn Bartlett, testified that access

remained to both tracts after the taking and opined that total just compensation was

$417,825. To arrive at this figure, she used a comparable-sales approach only with no

3

severance-damage component. The Highway Commission renewed its motion for a directed

verdict at the close of all the evidence; the court again denied it, and the case went to the

jury with instructions that it could consider restoration or cost-to-cure evidence “only as an

aid in arriving at the amount of just compensation” and that such costs “are not the measure

of damages.” The jury returned a verdict of $3 million.

On June 20, 2024, postverdict but before entry of the final judgment, the Lewises

moved for prejudgment interest at “a proper rate,” attorney’s fees, costs, and appraiser’s fees,

relying on Arkansas Code Annotated section 27-67-317(b) (Repl. 2022), and Wilson v. City

of Fayetteville, 310 Ark. 154, 838 S.W.2d 366 (1992). The motion included the Lewises’

contingency-fee agreement, counsel’s affidavit and itemized billing records, a second

attorney’s affidavit opining that the rate, time, and fees claimed were reasonable, and a CPA’s

affidavit opining that a reasonable rate of return on a moderately invested portfolio ran from

7.7 percent to 8.2 percent, compounded annually. The Highway Commission responded on

July 30, making several arguments; it did not, however, contest the reasonableness of the

rate, hours billed, or requested amount.

On August 12, the circuit court entered judgment on the jury’s verdict, awarding the

Lewises the roughly $2.582 million balance remaining after the Highway Commission’s

deposit plus interest at 8 percent, compounded annually, accruing from August 7, 2015, the

date of the taking. The court separately awarded $123,195.68 in attorney’s fees, costs, and

4

appraiser’s fees plus interest at 8 percent, compounded annually, accruing from the date of

the judgment. From this, the Highway Commission timely appealed.1

II. Evidence of Road Building

The Highway Commission first argues that the court abused its discretion by

admitting evidence that the Lewises built roads and roundabouts after the taking. We review

a circuit court’s decision to admit or exclude evidence for abuse of discretion. Dovers v.

Stephenson Oil Co., 81 Ark. App. 92, 98 S.W.3d 462 (2003).

Cost-to-cure evidence has long been admissible in Arkansas condemnation cases as

an aid to determining the diminution in market value a taking caused and as evidence of a

landowner’s efforts to mitigate that diminution. Ark. State Highway Comm’n v. Ptak, 236 Ark.

105, 364 S.W.2d 794 (1963); Ark. State Highway Comm’n v. Dean, 244 Ark. 405, 425 S.W.2d

306 (1968). The controlling authority is Arkansas State Highway Commission v. Speck, 230 Ark.

712, 324 S.W.2d 796 (1959). In Speck, a controlled-access taking left a farm without direct

access to a severed tract, and our supreme court approved evidence of the cost to build a

replacement road and bridge restoring that access as “a proper element to consider” in

valuing the remainder. Id. at 718, 324 S.W.2d at 799.

We measure just compensation as of the date of taking, comparing the value of the

property immediately before the taking with its value immediately after, as though the

condemnor’s project were then complete. Ark. State Highway Comm’n v. Littlefield, 247 Ark.

1

The Lewises filed a notice of cross-appeal but explicitly abandoned it in their response brief.

5

686, 447 S.W.2d 146 (1969). That rule fixes the valuation date; it does not require every

item of cost-to-cure evidence to be contemporaneous with the taking. Speck contemplated

this. In Speck, the supreme court explained that the jury determines “the type of

improvement that will more nearly restore the property to its original status,” with such

“prospective expenditures” serving “only [as] an aid in determining the difference in the

before and after value of the property.” Speck, 230 Ark. at 720, 324 S.W.2d at 800. The

timing of construction accordingly bears on the weight of cost-to-cure evidence and is not a

categorical bar to its admission.

That is the finding the court made on this record twice. The Highway Department’s

taking extinguished the Lewises’ direct frontage access to Dave Ward Drive, the property’s

“most prime” access. The roads the Lewises built were the means of restoring functional

access to the part of the property fronting the highway. Cody Lewis testified that if the

Lewises were “going to use this property at all,” they had no choice but to build the road the

City designed.

Whether that testimony—and the City’s demand—in fact flowed from the taking or

instead reflected development costs the Lewises would have borne regardless of it was

squarely contested. At the 2024 hearing on the Highway Commission’s renewed motion in

limine, its counsel read into the record Thompson’s 2018 deposition testimony. When asked

directly whether the Lewises would still have had to put in a road had the Commission’s

project never happened, she answered yes. The circuit court heard that argument and denied

the motion anyway for the reasons it had already given in 2018. At trial, the Commission

6

put the same proposition to Thompson again, and her answer was more qualified than the

deposition excerpt, standing alone, suggests. She agreed that, because the property had no

internal roads and a preexisting ditch already blocked travel between its northern and

southern portions, part of the Lewises’ development plans “would have needed” some road

work regardless of the taking, but she maintained throughout that the taking of the Dave

Ward Drive frontage was what “took away [the Lewises’] ability to commercially develop it

the way [they] wanted to” since, absent the taking, “[t]hey would have had frontage off of

Dave Ward Drive.” The Commission pressed its contrary theory directly to the jury in closing

argument: “[T]hey would have needed a road anyway. . . . How else are you going to get up

there?” The jury heard both sides of that dispute and was entitled to resolve it either way.

The fact that the $3,000,000 verdict came in below Thompson’s own $3,886,900 opinion

of total just compensation is consistent with a jury that weighed the Commission’s causation

argument and discounted for it, not one that disregarded it. Resolving that kind of causal

dispute is the jury’s task, not ours. See Ark. State Highway Comm’n v. Fowler, 240 Ark. 595,

401 S.W.2d 1 (1966) (affirming a condemnation verdict against a substantial-evidence

challenge where the landowners’ and the Commission’s valuation testimony conflicted).

The dissent would go further and hold that any relevance of the road-building

evidence was conditioned on a showing, under Ark. R. Evid. 104(b), that a willing buyer

could have determined from regulations or ordinances in force on the date of taking that

this specific cost would follow. That argument is not before us. Neither of the Highway

Commission’s two motions in limine asked the circuit court to apply a Rule 104(b)

7

conditional-relevance screen, and neither of its briefs on appeal mentions Rule 104(b). We

do not reverse a circuit court’s decision that fails to apply a framework no party asked it to

apply, and we do not construct an appellant’s argument for it where the appellant has not

made it.

The Highway Commission’s principal authority, Arkansas State Highway Commission v.

Barker, 326 Ark. 403, 931 S.W.2d 138 (1996), does not require a different result. Barker

reversed a verdict built on a betterment with no tie to restoring any access or utility the taking

itself had impaired. Our supreme court held that a landowner is entitled to just

compensation, not to be “unjustly enriched at the expense of the public purse.” Id. at 407,

931 S.W.2d at 141.

In Barker, Barker’s circular driveway, like the Lewises’ roads, was built in part to

restore access the taking had impaired. What our supreme court condemned was not that

connection but the appraiser’s method. The appraiser deducted the driveway’s $10,300 cost

and maintenance directly from his comparable-sales after-taking value so that the cost of the

cure became, in effect, the measure of damages rather than an aid to the jury’s own

determination of diminution.

Here, by contrast, the circuit court instructed the jury that restoration costs “are not

the measure of damages to which the landowners are entitled, but may be an aid in

determining the difference between the before and after value of the property,” and neither

Thompson nor the Lewises asked the jury to award the roughly $8 million in construction

costs and land value the City’s design required—or any other cost-to-cure figure—as damages

8

in its own right. Again, the $3,000,000 verdict that came in below Thompson’s own

$3,886,900 opinion of total just compensation suggests the jury did what the instruction

asked, not what Barker forbids.

Finally, the record itself surfaces a genuine conflict over whether Enterprise Road,

one of the Lewises’ two remaining points of access after the taking, was, as the Lewises’

appraiser testified, a private road unsuited to commercial use; or, as the Lewises’ own

accountant testified on cross-examination, a road the family’s predecessors dedicated to the

City in 1990. Both versions are in the record, and it was for the jury, not this court, to weigh

them. But the conflict does not change our result because, regardless of either version, the

undisputed evidence was that Enterprise existed to let a utility reach a power station with a

roundabout the City “specially designed” for that single purpose—not to serve as

commercially zoned highway frontage. A reasonable jury could find that whether or not the

underlying right-of-way was privately held or publicly dedicated, Enterprise did not

functionally replace the direct, by-right frontage access to Dave Ward Drive that the taking

eliminated.

We find no abuse of discretion in admitting the cost-to-cure evidence, and we affirm

on this point.

III. Substantial Evidence

The Highway Commission next argues that the circuit erred in allowing evidence of

severance damages because the Lewises still had reasonable access. It explains this error

resulted in an excessive judgment not supported by substantial evidence. As explained above,

9

an actual taking of an access right can support compensation for the resulting impairment

of the remainder even where some other access remains. Ark. State Highway Comm’n v.

Billingsley, 247 Ark. 49, 444 S.W.2d 259 (1969). Whether the remaining access was, in fact,

reasonably equivalent is a question of fact. Ark. State Highway Comm’n v. Rye, 255 Ark. 223,

499 S.W.2d 624 (1973).

The record supports the jury’s resolution of that question, including the causation

dispute addressed above. The Lewises’ appraiser, Diana Thompson, an experienced,

credentialed appraiser, opined that total just compensation was $3.8869 million. To arrive

at this figure, she used a comparable-sales approach for both tracts and, for tract 1, an

income-capitalization approach reflecting lost rental income. Trustee Cody Lewis testified as

a landowner familiar with property his family had held for decades that without the citymandated roads, the property was much less valuable and had little commercial use after the

taking. Neither witness’s testimony was struck, and a landowner’s opinion of his own

property’s value is competent evidence without further qualification. Ark. State Highway

Comm’n v. Person, 258 Ark. 379, 525 S.W.2d 77 (1975). Against that testimony, the Highway

Department’s own appraiser valued the taking at $417,825. To arrive at that figure, he used

comparable sales alone without a time adjustment and without any severance-damage

analysis. The jury’s $3 million verdict sits within the range framed by the parties’ valuation

witnesses. Facts in dispute and determinations of credibility are solely within the province of

the fact-finder. City of Jacksonville v. Nixon, 2014 Ark. App. 485, at 6, 442 S.W.3d 906, 911.

We are unable to say the damages on this record are excessive, and we affirm on this point.

10

IV. Attorney’s Fees

The Highway Commission argues that Ark. R. Civ. P. 54(e)(2) required separate

litigation because the Lewises moved for fees on June 20, 2024—before the August 12, 2024

judgment—and the Highway Commission’s response argued the motion was not yet ripe.

The construction of a court rule is a question of law, which we review de novo. State ex rel.

Rutledge v. Purdue Pharma L.P., 2021 Ark. 133, 624 S.W.3d 106.

Rule 54(e)(2) sets an outer deadline for a fee motion, “no later than 14 days after

entry of judgment,” to guard against tardy requests. Nothing in the rule forbids moving

earlier, so long as the opposing party has fair notice and a meaningful opportunity to respond

before the matter is resolved. We reached the same conclusion in Vaughn v. Bates, 2010 Ark.

App. 98, 379 S.W.3d 1, holding that the rule’s core concern is satisfied once the opposing

party has notice and an opportunity to be heard, regardless of whether the motion technically

preceded the judgment.

The Highway Commission attempts to distinguish Vaughn because, unlike the silent

litigant there, it did object below. But the character of that objection matters. The Highway

Commission’s response argued only that the motion was premature; it did not dispute the

hours billed, the hourly rate, the reasonableness of the expenses, or the supporting affidavits,

and it did not seek a hearing or additional time to respond to the merits. Having had a full

opportunity to contest the substance of the request and declining to do so, the Highway

Commission demonstrates no prejudice from the timing of the motion.

11

The Highway Commission also argues that the circuit court erroneously awarded

attorney’s fees, costs, and expenses plus interest at 8 percent compounded annually.

Under Arkansas Code Annotated section 27-67-317(b), attorney’s fees are authorized

when the jury’s award exceeds the amount deposited into the court’s registry by more than

20 percent. That condition was met here because the Highway Commission deposited only

$417,825 as its estimate of just compensation, and the jury’s award exceeds that amount by

more than 20 percent..

The Highway Commission argues that the Lewises were not entitled to 8 percent

compounded interest on this award because Ark. Code Ann. § 27-67-316(e)(1) (Repl. 2022)

caps the rate at 6 percent per annum. But § 27-67-316(e)(1) expressly applies to interest

included as part of the just-compensation award—interest on the value of the property itself—

not to collateral awards of fees, costs, and expenses under § 27-67-317(b). And the Highway

Commission correctly acknowledges that attorney’s fees, costs, and expenses are not a

component of just compensation. See Ellis v. Ark. State Highway Comm’n, 2010 Ark. 196, at

11, 363 S.W.3d 321, 327–28 (declining to extend the just-compensation interest rationale

of Wilson v. City of Fayetteville, 310 Ark. 154, 838 S.W.2d 366 (1992), to attorney’s fees).

Section 27-67-316(e)(1) is therefore inapplicable.

The Highway Commission has not identified an alternative rate that would displace

the circuit court’s choice of 8 percent. It has thus failed to carry its burden of demonstrating

that the circuit court’s interest rate was erroneous.

Affirmed.

12

KLAPPENBACH, C.J., and ABRAMSON, VIRDEN, and HIXSON, JJ., agree.

HARRISON, J., dissents.

BRANDON J. HARRISON, Judge, dissenting. Even in Arkansas State Highway

Commission v. Barker, 326 Ark. 403, 931 S.W.2d 138 (1996), the record did not establish the

landowners would have built the same access “cure” if there had been no condemnation.

This record does. The Lewises’ appraiser admitted at deposition they would have had to

build a road along this route to develop this property whenever they did so. The “cure”

evidence that was wrongly admitted in Barker was a forty-foot driveway that unjustly enriched

the landowners by $10,000. Here, it is almost a mile of paved development roads and

roundabouts through raw dirt. Some might call that a windfall. What contributed to it?

Testimony the circuit court allowed (over two motions in limine) that an employee of the

City of Conway told the Lewises after the condemnation that “to use this property at all”

they would have to build and dedicate a network of roads through their holdings. A

convenient demand, perfectly timed. The Lewises put the cost of the roads at $4 million,

$4.5 million, or $8 million. But for the taxpayer-funded highway work, they’d have had to

pay for it all themselves. The litigation toll is more than $2.5 million—plus prejudgment

interest at 8 percent compounding since August 2015, about $3.5 million as I reckon it.

*

On 7 August 2015, the Arkansas State Highway Commission condemned, in two

strips, 1.62 acres of “the last developable corner lot on an intersection in Conway” close to

I-40, which fronted Dave Ward Drive (Highway 286) to the south. The Lewises owned the

13

twenty-nine adjoining acres and dozens more to the north. The land was “developable”

because they hadn’t developed it yet. It was fenced but unimproved—the kind of place you’d

put a fireworks stand.

The Commission condemned the land to widen Dave Ward and turn two

intersections into roundabouts. The new highway plan controlled access to Dave Ward near

the intersections. Because of the nine-year trial delay, the record includes aerial photos before

and after the highway construction that illustrate the change. In the images below, the

condemned tracts (marked 1 and 2) are enclosed by blue lines at the bottom and sides and

red lines on top; they are separated by the right-of-way to Enterprise Avenue running north.

The red segments with triple hash marks indicate where the Commission condemned

highway access to Dave Ward, the road at the bottom. That’s the “loss” of access we’re

talking about.

First before condemnation:

14

Now after:

In the “before” image, Tract 1 is rented to a mobile-home dealership. You can see

four dirt driveways to Tract 1 from Dave Ward or the curved frontage road to the left, and

one from Dave Ward to Tract 2. The “after” image shows that the three driveways to Tract

1 are gone and the driveway to Tract 2 has moved. But there is a new paved outlet from the

new roundabout into the Lewises’ property. And to replace the dirt driveways, the

Commission built a paved driveway to Tract 2 from Enterprise and two more to Tract 1 west

of this area.

15

If this was the access loss, what was the “cure”? The network of paved roads and

roundabouts is shaded below in blue and green. I added the dotted rectangle to show where

the aerial photos fit.1

The area the Lewises paved begins on Enterprise at the roundabout outlet the Commission

built. Best I can tell, the parts of their property that are considered remainder Tracts 1 and

1

This important diagram—the only depiction of the roads charged to the

Commission—appears in the record at RP 149 and 236. For some reason, both pages have been rotated upside down, RP number and all.

16

2 end to the north about where Enterprise starts to curve left.2 The bell-shaped symbols

beneath Tract 1 are paved access points on the frontage road. 3 The Lewises retained access

to Dave Ward on Tract 2. The orange highlight shows where.

Some cure. The Lewises’ lawyer asked in closing, “Would a businessperson, in

deciding what to pay for the property, consider the fact that the City of Conway is going to gig

them for $8 million to use any of the property?” (Emphasis added.) Well, a few problems with

that.

The Lewises were seeking compensation from the Commission, not the City.

The City made that demand months or years after the condemnation.

Nothing linked it to the condemnation causally in any previously recognized

way.

The only people gigged were the taxpayers.

The measure of damages for a partial taking is the difference between the market

value of the whole tract immediately before the taking and the market value of the part that

2

I should not have to guess. For a case with veteran Commission lawyers on both sides—condemnation specialists all, in other words—the appellate record is no bueno. For that matter, neither was the trial record. The need to decipher where the Commission had condemned access on Dave Ward from hash marks on highway engineering schematics left the lawyers for both sides and many witnesses confused throughout these proceedings about how many access points remained—just a $4 to $8 million issue.

3

The relevant roads had multiple names before condemnation, and those names changed by the trial date:

Old Names Current Names

I-40 Frontage Road / Amity Road / South Crain Drive

Amity Road

Enterprise Avenue / Exchange Road New Amity Road / South Amity Road

17

remains afterward, less any enhancements peculiar to the lands. Barker, 326 Ark. at 407,

931 S.W.2d at 141. The aerial photos above were taken years apart; but the important

question is how the property changed over two consecutive days in August 2015—August 6,

the day before condemnation, and August 7, when we pretend the Commission’s planned

construction was retroactively complete. Ark. State Highway Comm’n v. Littlefield, 247 Ark.

686, 690, 447 S.W.2d 146, 148 (1969) (“An appraiser, in viewing the lands after a partial

taking, must consider the remainder as if the improvements were in place according to the

plans and specifications.”).

Losing sight of the time limits of that comparison—Condemnation Day versus

Condemnation Eve, if you will—is how this case left the rails. On Condemnation Day, this

was still a big dirt lot.

The Lewises rooted their $8 million severance-damages claim in testimony from their

appraiser, Diana Thompson. The supporting rationale seems to require freedom to take the

best of both conflicting sides of the issues. At least Thompson did that in her deposition,

which reads like the transcript of a shell game.4

For example, describing access before the taking, Thompson treated the dirt lot that

became Tract 1 as offering, like overflow parking at the fair, limitless options to drive from

Dave Ward to the rest of the Lewises’s holdings. The Lewises “had driveways down here on

Dave Ward that [they] could drive across to get to it.” They could do that because they “had

The deposition transcript was attached to the Commission’s renewed motion in limine to

4

exclude evidence of roadbuilding costs.

18

not developed it yet.” Okay, agreed. She said they could also use Enterprise, which was then

a gravel road, to access both tracts and their northern holdings. See this postcondemnation

pre-road photo:

In fact, Cody Lewis said at deposition that before the condemnation, Enterprise was the only

way to access their northern holdings from Dave Ward.

In Thompson’s Condemnation Eve analysis of what access the Lewises had lost to

condemnation, the right to drive from dirt driveways across a dirt lot was access good enough

to lose.

19

Not so on the Condemnation Day side. After condemnation, crossing the same dirt

lot from the remaining driveways—now paved—would no longer do. “That’s not the

maximum use of his land[,]” she said. On Condemnation Day, the Lewises could still use

Enterprise the same way they had on Condemnation Eve. But that would no longer do

either. They could use it, but “not commercially,” she said. They “could privately, because

that was a private road.” Of course, at the time there was still no commerce here to do. But

the Lewises were ready to change that.

Their bookkeeper, Audie Alumbaugh, testified that when they approached the City

later about getting a road built, a city employee said the Lewises would have to build it

themselves because “the City doesn’t build roads, they maintain roads.” The Lewises wanted

the blue road in the diagram above. But the City told them they “couldn’t build a road to

nowhere. So it was all or none at that point.” That testimony is hard to swallow. Why?

Because the road plan the City itself drew up for the Lewises afterward includes two roads to

nowhere—and a roundabout between:

20

I digress.

Why did the City require this? “They just did,” according to Bill Lewis. “You’d have

to ask them,” said Alumbaugh. Sounds like a taking all right—by the City. Sometimes it

must pay for its own roads, it seems. At Thompson’s deposition, she confused two road

names. She explained her confusion: “I’m doing another appraisal, I’m sorry, for the City

of Conway on Enterprise.” At trial, she testified the City considered Enterprise a private

road “not to be used for commercial development.” How did she know? Because she had

“worked on 18 of the roundabouts for the City of Conway.”

But Alumbaugh testified Enterprise was a dedicated road, not a private road. A deed

at page 386 of the record confirms that. The Lewises’ predecessors deeded it to the City in

1990—a 60-by-2100-foot strip—“as and for use as a public thoroughfare.”

Now pull that thread and pretend they had not done so. This condemnation left two

remainder tracts instead of one because the right-of-way to Enterprise separated the affected

remainder of the Lewises’ property. If their predecessors had not granted Enterprise to the

City, a condemnation for the same highway plan would have left one remainder tract.

By any measure, the paved outlet from the Dave Ward roundabout into one

remainder tract would be direct access to Dave Ward. Functionally it is anyway. If it was an

outlet into raw dirt, so what? So were the driveways the Commission condemned. The

paved outlet would give the Lewises the same kind of access on Condemnation Day they’d

had on Condemnation Eve. Indeed, better access at that spot. Nor would that be their only

21

access to Dave Ward on one remainder tract: the Lewises retained access, remember, at the

orange highlight below Tract 2.

The tract would still be undeveloped, of course. And driving across raw dirt would

still not be “the maximum use” of the land in Thompson’s formulation. But could there be

any pretense that “just compensation” required the Commission to subsidize $8 million of

development roads through it? I submit not. Where would that have left the Lewises?

Whatever road they built, Thompson testified, “ha[d] to be like all of the other roads

in that area.” We know the City would not be paying for it. And there was no evidence the

City’s road specifications would have been more lenient, or the roadbuilding cheaper, if the

Lewises could have built a road somewhere else. Thompson seemed to concede in her

deposition that, to the contrary, the Lewises would have had to build a road along this route

whenever they developed the property.

Now put Enterprise back. On Condemnation Day, did the Lewises have worse access

to these two tracts than to the hypothetical one? No. The paved outlet met a gravel road

running through their property, not raw dirt. Did they show it cost more to improve

Enterprise than to build a road north from elsewhere on Dave Ward? Again no. In fact, it

almost certainly cost less. How do we know?

The cost of construction was only half the $8 million severance damages the Lewises

asked the jury to consider. Four million was the value they gave seven acres of land they had

to donate to the City for New Amity Road. Enterprise, which already bisected their land,

22

sat on 2.9 acres.5 I concede the Lewises might have preferred that the City build and pay for

a road there. But they could not get the land back either way. Though it may be true that

before the taking the Lewises could have built a road north on a different route, who would

have done so? Every square foot of development road they could fit within the Enterprise

right-of-way saved a square foot of C-3 real estate they could sell instead.

What’s left of their severance-damages theory is a logical fallacy so old it was named

in Latin: post hoc ergo propter hoc, or “after this, therefore because of this.” Because the

condemnation limited the options to connect to Dave Ward, the whole cost to build a road

afterward was the Commission’s fault. Their counsel made this explicit after Thompson

answered yes to the question, “Did [the Lewises] only have to drive a few extra feet to get to

access off of either Enterprise or Amity?”

LEWISES’ COUNSEL: But in order to go that extra [few] feet and just build

the road through there, they had [to] spend $8 million;

is that fair to say?

THOMPSON: Yes.

The majority is right that condemning access along one side of highway frontage is a

compensable taking even if no land is left orphaned on the other side. Ark. State Highway

Comm’n v. Rye, 255 Ark. 223, 499 S.W.2d 624 (1973) (quarter mile of frontage reduced to

two fifty-foot access points). But that does not make the cost of whatever the landowner does

afterward the measure of compensation due. The requirement to pay just condemnation

5

I assume the seven claimed acres do not include the portion of New Amity Road within the 1990 grant; if the record includes a legal description of the New Amity Road donation, I have missed it.

23

“does not stand for the proposition that a landowner is entitled to be unjustly enriched at

the expense of the public purse.” Barker, 326 Ark. at 407, 931 S.W.2d at 141.

The focus of the change-in-value analysis, again, is Condemnation Eve versus

Condemnation Day. Past expenditures on improvements that no longer exist on

Condemnation Day are irrelevant. Ark. State Highway Comm’n v. Byrd, 237 Ark. 905, 908,

377 S.W.2d 165, 167 (1964) (property’s before-taking value “was neither greater nor less

because of the fact that a building had been located thereon for about four years”). So are

expenditures made after condemnation that are not needed to restore some function or

utility that existed then. Barker, supra.

In Barker, there was not much analysis of why evidence of the improvements should

not have been admitted. One answer is timing. The property should have been valued as

of the date of condemnation, but the landowners’ appraiser valued it as of fifteen months

later. 326 Ark. at 407, 931 S.W.2d at 141. In the meantime, the landowner had poured a

$10,000 concrete slab that was incorporated in the appraisal. The Lewises’ road project came

even longer after this condemnation; their first documented expense in the record is dated

January 2017, about seventeen months later.

In Arkansas State Highway Commission v. Speck, the supreme court approved the

admission of testimony about the cost to restore functional access and utilities (like irrigation)

to the severed part of what had been one working farm:

[W]e think it proper for the jury, after hearing the evidence, to determine the

type of improvement that will more nearly restore the property to its original status.

Let it be borne in mind that these prospective expenditures are not the

24

measure of damages, but are only an aid in determining the difference in the

before and after value of the property.

230 Ark. 712, 720, 324 S.W.2d 796, 800 (1959) (emphasis added). I hope the pivotal point

has been made clearly enough. The Lewises did not build these roads to restore the

property’s original status; the condemnation hadn’t changed it. They built them to improve

dozens of acres of dirt they had waited longer to develop commercially than any similar

landowner in the area.

Causation and common sense are part of this analysis. Ark. State Highway Comm’n v.

McNeill, 238 Ark. 244, 381 S.W.2d 425 (1964). That is why the attempt to bill the

Commission with the cost of this road should be rejected. The Commission argued that the

Lewises’ development plans, not the taking of access rights, caused them to improve the road

between these tracts. And it was right.

Roadbuilding expenses the Lewises would have borne before condemnation are not

the Commission’s responsibility just because the roads were built afterward. 6 Particularly

when the roads extend far past the boundaries of the affected tracts, and the demand to

build them all was made after condemnation by a different governmental body. That

demand might be a separate taking, after all. Calabria v. City of Fayetteville, 277 Ark. 489,

644 S.W.2d 249 (1982). On this record, the Lewises could either fight the City or roll over.

What they could not do is roll over for the City and stick the Commission with the bill.

6

Had the Lewises stopped at introducing evidence of the cost of the blue road on the diagram—$749,081, according to Thompson’s appraisal report—I would affirm.

25

A regulation or ordinance imposed by one government body can affect the damage a

landowner suffers in a condemnation by a different body. In Barnes v. Arkansas State Highway

Commission, 10 Ark. App. 375, 664 S.W.2d 884 (1984), we held that evidence that city

ordinances required a developer of land abutting a controlled-access highway to build and

dedicate a service road was properly admitted in a condemnation to build one. Our supreme

court had since held in Calabria, supra, that the same ordinances effected an unconstitutional

taking. But what happened after the taking was irrelevant: “The issue was whether the fact

that [the ordinances] existed, unchallenged and presumptively valid at the time of taking was

a factor that an ordinary prudent person would consider before purchasing the property.”

Barnes, 10 Ark. App. at 378, 664 S.W.2d at 886.

I cannot ignore the incentives created by treating a condemnation by one government

body as an open tab for whatever demands others decide to make later. I would hold that

any relevance of the roadbuilding costs here was conditional on a finding under Arkansas

Rule of Evidence 104(b) that a buyer could have determined from the published regulations

and ordinances in place on Condemnation Eve that this loss of access to Dave Ward would

change the cost to develop commercial access through the affected tracts. Evidence of the

marginal cost would then be relevant.7

7

The Commission did not argue that any part of the roadbuilding costs was even conditionally relevant. I would give it half a loaf because, as in Barnes, supra, the legal condition of the property at the time of condemnation can affect the change in value that results.

26

That would be in line with Barnes and our supreme court’s approach in Arkansas State

Highway Commission v. Hawkins, where it approved allowing a landowner who had begun

developing a subdivision before condemnation “to show the extra [or marginal] cost involved

in installing the sewer and water after the taking.” 246 Ark. 55, 64, 437 S.W.2d 218, 223

(1969) (emphasis added). That marginal cost “would classify as special damages not suffered

by the public in general, for Mr. Hawkins was obligated under the subdivision regulations of

the City of Morrilton to install the utilities before the different parcels could be put to a

residential use.” Id..

Here, the Lewises relied on what the City “just did” after the taking, not on what its

ordinances required then. This let them ask the jury to “consider the fact that the City of

Conway is going to gig them for $8 million to use any of the property”—in the Condemnation

Day value of the remainder—without subtracting from the Condemnation Eve value what

the City might have gigged them for anyway. Because I cannot conclude on this record that

those costs were a result of the condemnation, I would reverse the circuit court’s decision to

admit evidence of the roadbuilding costs and remand for a new trial.

*

Though reversing as we should would moot the interest-rate and fee issues (at least

for now), I note my concern about the incredible delay getting this nine-year case to a oneday trial. The condemnation was in August 2015. The matter was originally set for trial 8

May 2018. But the Lewises did not provide Thompson’s appraisals until March 22. Those

revealed that the parties’ valuations were about $3.5 million apart. Naturally, Thompson

27

had not been deposed yet either. The Commission represented that she said the Lewises’

counsel had told her not to do the appraisal until after the job was complete. The circuit

court quite appropriately granted a continuance. The order promised the case would be

reset in 2018.

But nothing happened for five years. Finally, in June 2023 the court entered a notice

that it would dismiss for want of prosecution under Arkansas Rule of Civil Procedure 41

unless good cause was shown. The Commission responded that the parties were waiting on

a trial date. When the case was finally tried in June 2024, the jury’s award retroactively

triggered nine years of prejudgment interest at 8 percent. Incredible. If my math is correct,

the accrued interest alone exceeds the unconscionable excess of “just compensation” in this

case. I would reverse and remand for a new trial.

*

Finally, a practice reminder. Much of this record consists of witnesses pointing to

unidentified parts of unidentified exhibits. Here are some ways to avoid that in a deposition,

for example:

ATTORNEY: Mr. Witness, we have an easel here with an enlargement of

an aerial photo the parties have stipulated will be admitted

at trial as Exhibit B-7. Do you see that?

WITNESS: Yes.

ATTORNEY: Do you recognize the area depicted in this photo?

WITNESS: Yes. This photo accurately depicts the layout of my property

as it appeared from the air on the date reflected in the label

here.

28

ATTORNEY: I’m handing you a photocopy of an aerial photo. Could you

please compare it with Exhibit B-7 and tell me whether they

appear to be the same?

WITNESS: Yes, they’re the same.

ATTORNEY: Great. I will mark the copy Exhibit 1. Just in case, I also

have here about 500 more identical copies. Agreed?

WITNESS: Do I need to count the copies? [Laughter.]

ATTORNEY: Yes! JK. Let’s move on. Now, you testified earlier that on

the date shown in the label of this exhibit, your driveway

intersected with Mister Witness Road. I’m handing you

what I just marked as Exhibit 1. What color Sharpie do you

like best?

WITNESS: Black.

ATTORNEY: Please take the black Sharpie and mark a D on Exhibit 1

where your driveway intersected with Mister Witness Road.

WITNESS: Here.

ATTORNEY: Super. Now please write your initials next to the place you

marked.

WITNESS: Here.

ATTORNEY: Understood. Mr. Court Reporter, I’ll make this Exhibit 1

to the deposition.

The duplicate copies, of course, allow counsel to repeat this process for other features of the

property. That way, if testimony on some point proves unnecessary—or the court orders it

excluded—the parties do not confuse the jury with unnecessary marks or risk losing the

exhibit altogether.

When the court reporter supplies the transcript, the exhibits (or copies of them) will

be included. Ark. R. Civ. P. 30(f)(1). These certified transcripts and copies can be attached

29

to motion papers as proof of where the features are. The exhibits can be introduced at trial

through the testifying deponent without requiring him to mark them up in open court.

Enlargements can be prepared in advance. If everyone agreed where the relevant things were

and counsel wanted to earn the gratitude of the jury and the appellate courts, the parties

could even stipulate to a legible summary exhibit with premarked labels for the witnesses to

refer to.

But anything would be better than “Here. (Indicating.).”

I respectfully dissent.

Angela R. Dodson, Arkansas Department of Transportation, for appellant.

Lawrence W. Jackson, for appellees.

30